My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002581
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2900 - Site Mitigation Program
>
PR0508238
>
ARCHIVED REPORTS_XR0002581
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:37:36 PM
Creation date
1/30/2020 1:35:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002581
RECORD_ID
PR0508238
PE
2950
FACILITY_ID
FA0008010
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
10500 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BMW8 / , / <br /> CE/*15 34KEY. Now <br /> ' <br /> GIfE—8 53 / / / / / * = APPROXIMATE BORING LOCATIONS <br /> APPROXIMATE <br /> MONITORING <br /> ESTIMATED EXTENT OFSOI LCONTAMINATION <br /> / CE = ELEVATION OF THE TOP OF PVC CASING ON THE <br /> NORTHERLY EDGE OF EACH MONITORING WELL <br /> SMW4 2' GWE = GROUNDWATER ELEVATION (1 1/30/01) <br /> CE+/ GWE— 24 / �= GROUNDWATER FLOW DIRECTION <br /> / I I 55 GALLON DBMS <br /> ENCLOSED TANK STORAGE J 55 ALLON GROUN11/11, WA <br /> f / / ,O / / <br /> / NOTES <br /> A5P T �k;L+15,69 / 1 SITE PLAN DRAFTED FROM FIELD MEASUREMENTS <br /> A9oVE0R0 D cONrtETE / I GWE 8 07/ 2 MONITORING WELLS SURVEYED BY ROBERT E YOUNG <br /> DIESEL Ti NK / J ENGINEERS <br /> FORMER WASTE O11 LIST � / /CONCRETE) <br /> �fSEL�TAHxO A90VEGROr1N� GWF1-814 p�7� / <br /> --- ---� GASOLINE TRRRANN11 C Z` 1.5 92 / 20 0G0 GALLOP / <br /> I 0 / 813 3 AI TAn11 C F—7f79 <br /> El <br /> ABOVEGROUND TANKS Q❑/ / // ` 1-_-� B,1/ / �E+1 M28� x2_14 <br /> -------1 6ULK Df4 TANKS I <br /> _ J <br /> / �B5♦ fX13-13 <br /> Bi <br /> DISPENSERS /ONCRETE DRNE 12-12 <br /> 6-I6 7-9' <br /> _ ♦ E 84 9B a}4-I3 <br /> CEf+15 88 I ----- j 87 ! ` EXrr-ro -145 IXr-rr <br /> /GWE-8 17 --- <br /> FORMER 12000 GALLON ann TANK f FUJL 83# EX10-13 IX9-}I <br /> 811 II l <br /> FORMER 10000 CALN DUNE TANKS <br /> !/ I 4 <br /> B8+r TRE CH <br /> 810♦ r I l <br /> 815 FORMER <br /> /�jB16 fl} f fff I 111 <br /> DISPENSER <br /> ISLAND <br /> r IE <br /> STORAGE SHED <br /> CE#1421 <br /> GWE <br /> B18♦ <br /> 917+ / <br /> GWE-786 <br /> CY+1464 0 10 20 30 40 50 <br /> � Scale in Feet <br /> SITE PLAN-DETAIL A WKA NO 2088 09 <br /> Drawn By BPM <br /> GRANITE CONSTRUCTION DATE 11101 <br /> WALLACE - KUHL & ASSOCIATES, INC Checked By MMW <br /> GEOTECHNICAL ENGINEERING French Camp,California PLATE NO 2 <br /> GEOLOGIC & ENVIRONMENTAL SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.