Laserfiche WebLink
G MW8 <br /> CE+15 34 <br /> GWE-69f <br /> ♦ - APPROXIMATE BORING LOCATIONS <br /> B - APPROXIMATE MONITORING WELL LOCATIONS <br /> = ESTIMATED EXTENT OF SOIL CONTAMINATION <br /> CE = ELEVATION OF THE TOP OF PVC CASING ON THE <br /> NORTHERLY EDGE OF EACH MONITORING WELL <br /> GWE - GROUND WATER ELEVATION <br /> ACE+f5 72 ♦- - GROUND WATER FLOW OfRECTION 5-11-95 <br /> GWE-8 83' <br /> ENCLOSED TANK STORAGE 55-GALLON DRUMS NOTES• <br /> CONTANfNG GROUNDWATER <br /> I SITE PLAN DRAFTED FROM FIELD MEASUREMENTS <br /> 2 MONITORING WELLS SURVEYED BY ROBERT E YOUNG <br /> ENGINEERS <br /> BMW5 <br /> ASPHALT CE+15 59 - <br /> ABOYECRpuND CONCRETE H CWF-8 78 <br /> FORMER WASTE OIL UST DIE5Et TANK <br /> CONCRETE PAO <br /> ABD!£SE1OVEGROTANKUND "WGRaW WE-8 52 FORMER <br /> - ---� GA5011N£TANK +t§92 10 O00 GALLON <br /> 13 MW3 DIESEL TANK GWE-8 32 <br /> -- CE+1527 <br /> j ABOV£CROUNQ ' ---- 8!4 MW66 <br /> -------j BULK OIL TANKS <br /> 812 l B5+ <br /> DISPENSERS CONCRETE DRIVE l <br /> GG MW2B -------' 87 I 84t 6 <br /> GWE 1845 r----- <br /> I <br /> FORMER 120GALLON DIESEL TANK +B11 FUEL B3+ <br /> 00 <br /> FORMER IO 000 GALL ON GASOLINE TANKS PIPELINE <br /> 810♦ I ------ 88+ TRENCH <br /> j <br /> FORMER <br /> / DISPENSER <br /> ♦8Ifi � / ISLAND <br /> STORAGE SHED 89+ <br /> MW 19 <br /> CE+f4p f <br /> GWE-8 30 <br /> it P1 <br /> BIB+ <br /> Bt7+ <br /> GWE-8 08 <br /> CE+14 64 <br /> 0 10 20 30 40 50 <br /> MW78 <br /> Scale In Feet <br /> SITE PLAN WKA NO 2088 05 <br /> Drawn By HLA <br /> GRANITE CONSTRUCTION DATE 5/95 <br /> WALLACE ■ KUHL & ASSOCIATES, INC Checked By MMW <br /> GEOTECHNICAL ENGINEERING French Camp, California PLATE NO 2 <br /> GEOLOGIC & ENVIRONMENTAL SERVICES <br />