Laserfiche WebLink
_ s � <br /> Barclays Business Credit <br /> Mr. Greg Ennis <br /> June 30, 1993 <br /> Page 2 <br /> SCHEDULE AND REPORT <br /> TRC can begin the permitting process upon receipt of your authorization to proceed. The drilling program for <br /> each well is approximately 4 days of drilling and 1 day of development. A 2-week turn-around-time will be <br /> requested from the analytical laboratory for chemical analysis. The report will follow approximately 2-weeks after <br /> receipt of the analytical data. The report will include discussion of the field program, presentation of findings, <br /> and conclusions of results. Analytical data will be tabulated and lithologic and geophysical logs from the borings <br /> will be included. <br /> TRC has left several voice mail messages with Mr. Jack Haynes with Sharpe Army Depot. We will continue our <br /> efforts to contact him to ask about responsibility claims if contamination is discovered. <br /> If the above scope of work meets with your approval, please sign and return the attached Confirmation of <br /> Authorization Form. If you would like to discuss or modify the scope of work as presented, please call me and <br /> I will be happy to assist you. <br /> Yours very truly, <br /> TRC Environmental Corporation <br /> Catherine A. Henrich, C.E.G. <br /> Principal Hydrogeologist <br /> Attachments: Confirmation of Authorization <br /> Time and Materials Contract, Schedule of Rates and Terms <br /> General Terms and Conditions <br /> TRC <br />