My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
11800
>
2900 - Site Mitigation Program
>
PR0501821
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:02:28 PM
Creation date
1/30/2020 1:43:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0501821
PE
2950
FACILITY_ID
FA0003875
FACILITY_NAME
SAN LORENZO LUMBER
STREET_NUMBER
11800
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19603003
CURRENT_STATUS
01
SITE_LOCATION
11800 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL 26 '93 03:39PM _ETALUMA (707) 762-3614 F- <br /> 5.0 HAZARDOUS WASTE SAFETY TRAINING AND MEDICAL MONITORING <br /> Employees assigned to the project will have completed a 40-hour OSHAIEPA Hazardous <br /> Waste Site Investigation Health and Safety training course. Topics covered in the course <br /> include physical, chemical, and toxicological properties of hazardous materials; hazard <br /> evaluation and control; safe working practices; selection, care, and use of personal protective <br /> equipment (including fit testing); sampling and monitoring techniques and equipment; and site <br /> entrance and decontamination procedures. Supervisors will have completed an additional <br /> supervisor training course and will have annual refresher training as needed_ <br /> Tailgate safety meetings will be held where safe working practices, emergency procedures, <br /> personal protective equipment, and other item in this Site Safety Plan will be discussed before <br /> work begins. At the meetings, employees and subcontractors will also be informed of the <br /> location of services and the nearest telephone for use in emergency situations. The meeting <br /> participants, items discussed, locations, and dates will be recorded in a field log. <br /> Each field employee performing work at the site will be responsible for complying with the <br /> procedures described in this Site Safety Plan. The Project Manager may visit the site during <br /> the field investigation to evaluate the effectiveness of the program. <br />
The URL can be used to link to this page
Your browser does not support the video tag.