Laserfiche WebLink
ARCO Products Cornpar, Y <br /> l 2000 Alameda de las Pulgas <br /> Mailing Address : Box 5811 - <br /> San Mateo , California 94402 r - r r - L- i ' At I_Til <br /> Telephone 415 571 2400 <br /> F , 1 ? 35 <br /> July 29 , 1994 <br /> Ms , Donna Heran <br /> San Joaquin Co. Public Health Services <br /> Environmental Health Division <br /> P . O . Box 388 <br /> Stockton, CA 95201 -0388 <br /> Re : ARCO meeting with PHS/EHD staff <br /> Dear Ms. Heran : <br /> ARCO will gladly meet with the PHS/EHD staff on August 9, 1994 at 10: 00 AM <br /> as requested in your July 14, 1994 letter. However, I was disturbed to read that <br /> the PHS/EHD staff believes that the commitments which ARCO made in March <br /> of 1993 have not been met and that ARCO has failed to comply with our mutual <br /> agreements. This is simply not the case and I believe that you have been <br /> 9 PY <br /> misinformed by your staff. This letter reviews action items which were agreed <br /> upon at the March 1993 meeting and work which ARCO has performed to <br /> address the action items. <br /> Resna, on behalf of ARCO , mailed on April 22, 1993 a summary of the ARCO - <br /> i PHS/EHD meeting to Ms. Laurie Cotulla of the PHS/EHD and Ms . Beth Thayer <br /> of the RWQCB . On April 29, 1993 the PHS/EHD responded with a letter to <br /> ARCO which also summarized the meeting and presented action items which <br /> were to be performed . Site specific discussion of the action items follow. <br /> Fac. #2130, 7906 N. EI Dorado St., Stockton <br /> j PHS/EHD recommended that additional offsite wells be installed to the <br /> h south and that the results of the air sparging tests be submitted. <br /> In early November of 1993, after access permission had finally been <br /> granted by Cal Trans , ARCO was able to install 2 wells south of the facility. <br /> Three sampling events have been performed on these wells since they were <br /> installed . ARCO has issued the following reports on this site since the March ' 93 <br /> meeting: a) quarterly status reports dated 4/14/93 , 6/3/93710/14/93, & <br /> 2/16/94, <br /> b) Air Sparge Pilot Test report dated 6/21 /93 , <br /> c) Limited Subsurface Investigation report dated 6/30/93 , <br /> d) Underground Storage Tank Removal report dated 2/16/94 <br /> e) Problem Assessment report dated 6/6/94 <br /> f) Final Remediation Plan for Soil & Groundwater dated 6/7/94. <br /> APPC G2=-D <br /> ARCO P,mUas Com Par 5 a DW%10. - - _„�ICeJCmiemc P v (9-88) <br /> i <br />