Laserfiche WebLink
i <br /> report documents the limited extent of soil contamination at the site . <br /> The yearly groundwater sampling report, as required by PHS/EHD, is <br /> anticipated to be issued in September of this year. <br /> Fac. #2133, 2908 Benjamin Holt Drive, Stockton <br /> Offsite wells to be drilled once access has been granted and an additional <br /> monitoring well in the northwestern area of the site will be installed. A workplan <br /> to install vapor extraction wells to be submitted by May 31 , 1993. <br /> ARCO has issued numerous reports on this site since the March ' 93 <br /> meeting , among them are: <br /> a) quarterly status reports dated 9/3/93 , 12/6/93, 3/10/94, & 6/21 /94 <br /> which document that the groundwater recovery system has the <br /> groundwater plume under hydraulic control . <br /> b) Work Plan for Installation of various Wells dated 5/14/93 . <br /> c) Soil Vapor Extraction , Air Sparge , & Groundwater Monitoring <br /> Well Installation report dated 3/10/94 which documents the installation of <br /> all wells discussed in the previous work plan , <br /> d ) a Soil Vapor Extraction / Air Sparge System Installation <br /> Schedule dated 7/7/94 which documents the scheduling and permit status <br /> of the soon to be constructed remediation system . <br /> e) Work Plan for Installation of On-site Soil Vapor Extraction and <br /> Air Sparge Wells dated 7/18/94. <br /> An air emission treatment unit is currently stored at the site. All permits for <br /> construction of the remediation system have been obtained , the construction <br /> contractor has been selected and the construction of the remediation system is <br /> planned to begin shortly after the Labor day weekend . <br /> ARCO received a 3/24/94 letter from the PHS/EHD which stated that the <br /> PHS/EHD appreciated ARCO' s efforts over the past year at this site . Clearly, <br /> ARCO is moving forward with remediation at this site while a neighboring oil <br /> company continues to only monitor their sizeable problem . <br /> Fac. #548, 1612 Hammer Lane, Stockton <br /> PHS/EHD requested continued definition of soil and groundwater <br /> contamination . Remediation will proceed when the contamination has been <br /> defined and equipment becomes available. <br /> ARCO has issued the following reports on this site since the March '93 <br /> meeting : a) quarterly status reports dated 6/21 /93, 9/13/93 , 11 /8/932 & <br /> 6/15/94. <br /> b) a Work Plan for additional wells dated 10/14/93 <br /> c) a status report & Problem Assessment report dated <br /> 5/11194. <br /> The PHS/EHD has requested additional information by 8/15/94 which <br /> ARCO will provide at that time. <br />