Laserfiche WebLink
H <br /> m <br /> Ln <br /> M <br /> M HAMMER LANE <br /> - <br /> N - EXPLANATION <br /> O Monitoring well <br /> ru DRIVEWAY DRIVEWAY G Vap r extraction well <br /> ``' Sign postero A • Soil boring <br /> A PUMP ISLAND MW-3 �'y� (6,200/420) Con entration of total <br /> • © F,p i petroleum <br /> 0 8-15 (<so*/<0 5) hydrocarbons as gasoline (TPHG) <br /> and, benzene in groundwater, <br /> Telephone <br /> 08 %8_5 parts per billion (ppb); samples <br /> collected on March 19, 1997 <br /> booths PUMP ISLAND <br /> v <br /> B-13 G •B-18 * They sample contains a single non-fuel <br /> VW-4 rn component elating in the gasoline range, <br /> AC PAVING Z an quantified as gasoline <br /> MW-2 Q <br /> SALES BUILDING (<50/0.6) a <br /> •SBI-0 i <br /> G VW-2 <br /> am <br /> T5 El � �] <br /> BMW-1 � <br /> CONCRETE (230/11) <br /> B-16• <br /> 08-12 FTIF-7 r -1 <br /> S • B-17 1 T1 JIT211 T3 I IT41 • B-1 <br /> LJLJ� 1 I I <br /> M �-J LJ 0VW-1 s <br /> OM -4 VW-3 G MW-5 <br /> (<50/<0.5) (6,200/420 <br /> ©MW--6 <br /> (<50/<0 5) <br /> rn <br /> N <br /> a Sour e: Base modified from map provided <br /> w <br /> by Tom O. Morrow, Inc. <br /> � PRODtICTS T SU FIGURE NO. <br /> c E m C Q n SCALE: 0 30 60 FEET 16112 CAUFOW <br /> EI11 2 <br /> 0 <br /> S1pN; <br /> 00 PROJECT NO <br /> GMMALQ:D = PLAN 806-14&=7 <br />