My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0001964
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
ARCHIVED REPORTS_XR0001964
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 8:30:55 PM
Creation date
1/30/2020 2:17:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001964
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
partially obstructed by silt, was recorded to the nearest 0 1 foot on the depth to <br /> water/floating product survey form <br /> Well Purging <br /> Before sampling occurred, a polyvinyl chlonde (PVC) ballei, centrifugal pump, low-flow <br /> submersible pump, or Teflon bailer was used to purge standing water in the casing and <br /> gravel pack from the monitoring well Monitoring wells were purged according to the <br /> protocol presented in Figure A-1 In most monitoring wells, the amount of water purged <br /> before sampling was greater than or equal to three casing volumes Some monitoring wells <br /> were expected to be evacuated to dryness after removing fewer than three casing volumes <br /> These low-yield monitoring wells were allowed to recharge for up to 24 hours Samples <br /> were obtained as soon as the monitoring wells recharged to a level sufficient for sample <br /> collection If insufficient water recharged after 24 hours, the monitoring well was recorded <br /> as dry for the sampling event <br /> Groundwater purged from the monitoring wells was transported in a 500-gallon water <br /> trailer, 55-gallon drum, or a 325-gallon truck-mounted tank, to EMCON's San Jose or <br /> Sacramento office location for temporary storage EMCON arranged for transport and <br /> disposal of the purged groundwater through Integrated Waste Stream Management, Inc <br /> Field measurements of pH, specific conductance, and temperature were recorded in a <br /> waterproof field logbook Figure A-2 shows an example of the water sample field data <br /> sheet on which field data are recorded Field data sheets were reviewed for completeness <br /> by the sampling coordinator after the sampling event was completed <br /> The pH, specific conductance, and temperature meter were calibrated each day before field <br /> activities were begun The calibration was checked once each day to venfy meter <br /> performance Field meter calibrations were recorded on the water sample field data sheet. <br /> Well Sampling <br /> A Teflon bailer was the only equipment acceptable for well sampling When sainples for <br /> volatile organic analysis were being collected, the flow of groundwater from the bailer was <br /> regulated to nururr= turbulence and aeration Glass bottles of at least 40-milliliters <br /> volume and fitted with Teflon-lined septa were used in sampling for volatile organics <br /> These bottles were filled completely to prevent air from remaining In the bottle A positive <br /> meniscus formed when the bottle was completely full A convex Teflon septum was placed <br /> over the positive meniscus to eliminate air After the bottle was capped, it was inverted and <br /> SACNN\M"80M8051400 SCS 95\cjb 1 A-3 Rev 0 10/25/96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.