Laserfiche WebLink
1 <br /> f <br /> HAMMER LANE <br /> - N - <br /> EX LANATION <br /> © MoInitoring well <br /> DRIVEWAY DRIVEWAY 1 <br /> D Vapor extraction well <br /> Sign post--moo .o • Soil boring <br /> PUMP ISLAND w MW-3 �9,1.�� <br /> Lentration <br /> B-15 <90• �' {9.600/510) Coof total petroleum <br /> { /<0.5) hydrocarbons as gasoline (TPHG) <br /> and benzene in groundwater, <br /> Telephone • B-5 parts per billion (ppb); samples <br /> booths RUMP ISLAND co lected on August 29, 1996 <br /> B-13 G •8-18 <br /> -4 <br /> The sample contains a single non-fuel <br /> rn n1 component elating in the gasoline range, <br /> AC PAVING and <br /> quantified as gasoline <br /> MW-2 Q <br /> �• SALES BUILDING (<600/<0.5Q v <br /> •SBI—0 <br /> 0 VW-2 S <br /> Z <br /> Q <br /> T5❑ QMW-1 <br /> CONCRETE 1 <br /> (100/42) <br /> B-160 08-12 FIFIr- -1 F-1 ^� <br /> • B-17 I T1 JIT21I T3 I IT4I • B-1 <br /> L JL JI 1 I 1 <br /> L J I I Z <br /> Q VW-1 rn <br /> LJ <br /> O MW-4 VW-3 G <br /> /E (<50/<0.5) <br /> M4Y-5 <br /> (9,600/510 <br /> O MW-6 <br /> (<50/<0.5) <br /> N <br /> Of <br /> a <br /> Sou-ce. Base modified from map provided <br /> by Tom 0. Morrow, Inc. <br /> r• � <br /> U') <br /> ARCO MIWCTS COMPANY FIGURE NO. <br /> ARCO SERVICE STATION NO. 548 <br /> i E m c o n SCALE. 0 30 60 FEET CD 00 1442 OAMMEIt LANE <br /> ao STOCKTO , CALIFORNIA 2 <br /> I I I PROJECT No <br /> SITE PLAN 805-140.02 <br />