Laserfiche WebLink
AWAM <br /> June 15, 192 ——9 =fmn <br /> ARCO Service Station No 54$, Stockton, California <br /> Based upon previous investigations and the VET, we recommend that a work plan be <br /> prepared for the remediation of soil utilizing the existing ,apor-extraction wells and either <br /> a thermal or catalviic oxidizer Please call if you have an% questions regarding this letter <br /> report <br /> Sincerely, <br /> RESNA Industries <br /> p <br /> FiL AE JPQ1� Y <br /> Letitia Shen <br /> Staff Engineer <br /> Richard H Walls <br /> Sr Project Engineer <br /> P E 43139 <br /> Attachments Plate 1 Site Vicinity Map <br /> Plate 2. Generalized Site Plan <br /> Table 1 Vapor-Extraction Test Monitoring Data <br /> Copies of Chain of Custody Records and Laboratory Analysts Reports <br /> 0413cear <br /> 30004-5 3 <br />