My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0001976
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
ARCHIVED REPORTS_XR0001976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 8:34:47 PM
Creation date
1/30/2020 2:23:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001976
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Ms Margaret Lagorio Project 20805-140 010 <br /> August 10, 1998 <br /> Page 3 <br /> will be installed and the remaining annulus will be filled with cement grout tremied from <br /> the base of the annulus <br /> SVE Well installation <br /> One dual completion SVE well is proposed to supplement the existing SVE well network <br /> This well will be installed in the former UST complex, the location is based upon review <br /> of UST removal soil samples The borehole will be drilled using 10-inch diameter hollow <br /> stem auger drilling equipment and soil samples will be collected at 5-foot intervals Two <br /> to three soil samples will be preserved for Iaboratory analysis A HydroPunchOD <br /> groundwater grab sample will be collected at the water table and analyzed for purposes of <br /> assessing water table impacts <br /> The dual completion SVE well will consist of a deeper well completed in native soils <br /> beneath the former UST excavation and screened between approximately 20 and 35 feet <br /> bgs and a shallow well completed within the backfill and screened between approximately <br /> 5 and 15 feet bgs The dual completion well will be constructed using 2-inch diameter <br /> PVC casing and screen intervals will use 0 02 inch factory slot casing Number 3 sand will <br /> be used as filter pack The annular space between the two screen intervals will be sealed <br /> with bentonite chips <br /> Task 3 No Purge Sampling of SVE Wells <br /> The current groundwater levels are above the monitoring well screen intervals Therefore, <br /> the SJCPHS/EHD requested installation of shallow monitoring wells screened across the <br /> water table for delineation of the water table impacts ARCO proposes to collect no purge <br /> groundwater samples from existing vapor extraction wells VW-1, through VW-4 The no <br /> purge method is proposed to reduce the potential for plugging well screens with sediment <br /> that may be pulled into the well during well purging These wells are screened starting at <br /> depths of approximately 22 to 24 feet bgs and portions of the screen intervals are currently <br /> above the water table Thus, samples from these wells will provide data regarding the <br /> distribution and concentrations of dissolved hydrocarbons along the water table This data, <br /> along with HydroPunch0 samples collected at the water table during well installation <br /> activities will permit evaluation of the water table impacts <br /> SACIA 1549ON DOC-961mtt 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.