Laserfiche WebLink
H A M M E R L A N E <br /> BENCHMARK: ELEV. 10.67 EXPLA 777 <br /> NDRIVEWAY DRIVEWAY (USGS DATUM) <br /> CUT a TOP OF PLANTER CURB. 8-1 Soil Boring <br /> • 5108,2N <br /> �. E B-6fMW-1 <br /> 49p2.7E �.�0� ,a / Soil Boring/Monitoring Weil <br /> 0 SIGN POST pZ�' �4�, <br /> B-15 ��` B-1O/VW-1 Soil Boring/Vapor Extraction Well <br /> • P13MP ISLAM B–$/MW--3 �A 00 <br /> (330/27) j (4800/640) Concentration Of Total Petroleum Hydrocarbons <br /> As Gasoline/Benzene In Groundwater In Parts <br /> • per Billion. <br /> a;WAONE B-5 MSamples Collected On April 8, 1994 <br /> B--13 PUMP ISLAM B 0/VV1-4 <br /> B-18 Z <br /> AC PAVING <br /> AC PAVING <br /> B-7/MW-2 <br /> (<50/<1.5)+ 0 <br /> SAL0ESB1l0 IMG B-�-11/VW-2 0 B_4 <br /> • <br /> T5 ❑ 13-s/Mw-1 <br /> a <br /> CONCRETE APRON (150/22) <br /> C B-16 0 B-12 F�FIF -, F -, <br /> • ° B-17 1T111T211 T31 1 1 ©-1 D <br /> Z AC PAVING L JL J1 1 1T41 <br /> B10/VW-1 M <br /> J <br /> L1 1 , <br /> B-9/MW-4 — <br /> �I <br /> * (26/1.2) B-14/VW-3+ B-19/MW-5 <br /> (4800/64 <br />•. M <br /> B-21/MW-6 <br /> (28/4.8) <br /> 30 10 30 60 <br /> Source: Map modified from map provided <br /> by TOM 0. MORROW INC. Approximate Scale (feet) <br />• <br /> �� GENERALIZED SITE PLAN PLATE <br /> ARCO Service Station No. 648 <br /> �„� Ho. 1612 Hammer Lane <br /> PROJECT NO. 30004 OpL04F1k Stockton, California <br />• <br />