Laserfiche WebLink
Table 3 <br /> Operational Uptime of Soil Vapor Extraction System <br /> ARCO Service Station No.548 <br /> 1612 Hammer Lane, Stockton,California <br /> Time Uptime Total Uptime <br /> Between Between CumulativeTime Since <br /> Time of Readings Readings Percent Since System Startup <br /> Date Reading Hr.Meter Reading (days) (days) Uptime(%) Cause of Downtime/Shutdown Startup(Days) (days) <br /> 10/20/2003 12:30 23482.40 39 20.99 53.82% Unknown 1108 768.99 <br /> System shutdown on arrival due to high water <br /> 11/18/2003 11:00 level;System ran 552.1 hours(23 days)since <br /> 24034.50 28.94 23.0 79.50% October site visit 1136.9 792.0 <br /> System shutdown on arrival-based on chart <br /> 12/22/2003 8:30 recorder,system ran until 12-11-03. Hour <br /> 24586.50 33.90 23.0 67.85% meter reading based on chart recorder 1170.8 815.0 <br /> QUARTERLY UPTIME(DAYS)= 67.0 <br /> QUARTERLY TOTAL(DAYS)= 101.8 <br /> QUARTERLY PERCENT UPTIME(%)= 65.79% <br /> TOTAL UPTIME SINCE STARTUP(DAYS).W 1170.8 <br /> PERCENT UPTIME SINCE STARTUP' % = 69.61% <br /> Note: Any constants in equations for 10/16/2003 are from 9/23/2003 <br /> Please nate: Data starts at 4003 <br /> K;1Wprocess1.15 BP ARCO10054814 QTR 0410&M-4Qmr03 1 of 1 <br />