Laserfiche WebLink
t• <br /> HAMMER LANE <br /> DRIVEWAY DRIVEWAY <br /> I <br /> a-�— S€GN POST A <br /> PUMP ISLAND <br /> QD MW-3 <br /> <0. l <br /> <50 J <br /> 1.5 <br /> -e— TELEPHONE <br /> VW <br /> BOOTHS PUMP ISLAND�1 <br /> _ a <br /> <0.5 <br /> 0.95 <br /> <50 n <br /> AC PAVING <br /> MW-2 <br /> <D.5 <br /> SALES € 0.94�� 0 Q <br /> BUILDING Q <br /> VW-2 d <br /> 00[<M <br /> I1�.! <0.5 4 <br /> rn <br /> <0.5 � s <br /> m <br /> TS 0 Mw-1 <br /> CONCRETE 094 <br /> 320 <br /> €i r� <br /> vw D 1<50 1 <br /> ry <50 650 T1 T2 T3 TA H <br /> 0.5 7.2 , A <br /> M [<0.5 <1.0 AS <br /> &A9-1 m r <br /> I o VW-1 p <br /> AS-3 ALj <br /> VW-322 <br /> < J <br /> MWS �r 13 22 MW-5 , <br /> T{E <50 L 4.3 <50 - - <br /> <0.5 2.7 <0.5 <br /> <0.5 J <Q.5 <br /> SVE SYSTEM COMPOUND rMW <br /> l<0.5 <br /> <0.5 <br /> 0 <br /> LEGEND <br /> LL <br /> Q5 MWA MONITORING WELL LOCATION <br /> Q VW-1 VAPOR EXTRACTION WELL LOCATION <br /> ® AS-1 AIR SPARGE LOCATION <br /> • SB-1 SOIL BORING LOCATION N <br /> <5D TPH AS GASOLINE CONCENTRATION IN MICROGRAMS PER LITER(ug/L) 30 <br /> <0.5 BENZENE CONCENTRATION IN ug/L <br /> <0.5 MtBE CONCENTRATION IN ug/L <br /> SAMPLES COLLECTED ON 6 rAM Scale in Feet <br /> GROUNDWATER ANALYTICAL SUMMARY FIGURE <br /> 2970 Gateway Oaks Drive.Ste.300 <br /> Sacramento.CA 95633-3200 ARCO Facility No.548 ARCO Quarterly Groundwater 2 <br /> TEL(916)679.2000 1612 Hammer Lane Monitoring Report-2nd Quarter 2003 <br /> FAX:(916)679-2900 Stockton,California <br /> a <br /> m <br />