Laserfiche WebLink
Table 1 <br /> Well Construction Summary <br /> ARCO Station 9548 <br /> 1612 West Hammer Lane <br /> Stockton, California <br /> Casing <br /> Screen Interval (ft Depth to Water Diameter Well Drowned <br /> Well Name Total Depth (ft) bgs) (ft bgs)** (inches) (Yes/No) <br /> Monitoring Wells <br /> MW-1 65 48 -63 30.30 4 Yes <br /> MW-2 65 47 -62 29.83 4 Yes <br /> MW-3 65 43 -63 29.84 4 Yes <br /> MW-4 65 43 -63 31.21 4 Yes <br /> MW-5 62 42 -62 29.41 4 Yes <br /> MW-6 60 40 -60 29.08 2 Yes <br /> MW-7 40 25-40 29.25 2 No <br /> MW-8 100 95-100 29.80 2 Yes <br /> Vapor Extraction Wells <br /> VW-1 45 24-44 29.89 4 No <br /> VW-2 45 22 -42 30.87 4 No <br /> VW-3 45 22-42 30.51 4 No <br /> VW-4 46.5 24-44 30.57 4 No <br /> VW-5S* 35 5 - 15 15.10 2 No <br /> VW-5D 35 20-35 30.55 No <br /> Air Sp ar in Wells <br /> AS-1 60 47-48 29.97 2 Yes <br /> AS-2 60 47-48 30.40 2 Yes <br /> AS-3 65 49-50 30.29 2 Yes <br /> * Dual Completion Well; sampled 513104 <br /> ** Data from 4005 QMR <br /> ft bgs-feet below groung surface <br /> ft-feet <br /> l� <br /> I:1BP-ARC0104 BP Valley Portfolio15481Tables106-Q11548 Table 1-2-3-4 5/30/2006 <br />