Laserfiche WebLink
HAMMER LANE <br /> LEGEND' <br /> 0 MW-1 i MONITORING WELL LOCATION <br /> i�. VW—t VAPOR EXTRACTION WELL LOCATION <br /> ® AS-1 AIR SPARGE LOCATION <br /> • SB-1 SOIL BORING LOCATION <br /> DRIVEWAY DRIVEWAY <50 <br /> TPH AS GASOLINE CONCENTRATION IN MICROGRAMS PER UTER (ug/L) <br /> <0 5 BENZENE CONCENTRATION IN ug/L <br /> 1<20 I MTBE CONCENTRATION IN ug/L <br /> Sign post a A SAMPLES COLLECTED ON 9/28/00 <br /> PUMP ISLANDlF TPHG AND BENZENE ANALYZED USING EPA METHOD 8015/8020 <br /> 8--15• la <br /> MW-3 MTBE A YZED USING EPA METHOD 8260 <br /> �<50 <br /> <0 5 05] <br /> 161 <br /> Telephone •B-5 <br /> booths <br /> PUMP ISLAND VW-4 <br /> 8-13• Q •B-18 <br /> If <br /> AC PAVING IZU <br /> Rl <br /> 1 � <br /> MW-2 0 O <br /> SALEESr<50 l 4 <br /> BUILDING L<0 5 J <br /> 0 SB1-0 <2 D O <br /> VW-2 z �7 <br /> S <br /> T5 ❑ x2431 ®MW-1 <br /> CONCRETE L<2 0 J <br /> •B-16 68-12 --��--�i---i i--� North <br /> v i VW-5S/Di i i } <br /> •g-17 i T1 T2,&T3 i �T4 i • B—i <br /> AL--Ji._ a i AS-2 AAS-1 I <br /> <50 L---J (j)VW-1 <br /> <0 5] AS-3® <br /> <2 0 Q 137 VW-3 <br /> MW-4 <05 MW-5 <br /> 61 <br /> 0 30 FT <br /> SVE SYSTEM COMPOUND J MW-6 <br /> <50 <br /> <0 5 SCALE <br /> 3 98 <br /> FIGURE 3 <br /> GROUNDWATER ANALYTICAL SUMMARY <br /> 3rd QUARTER 2000 <br /> ARCO SERVICE STATION 548 <br /> 1612 HAMMER LANE <br /> STOCKTON CALIFORNIA <br /> PROJECT NO DRAWN BY <br /> DO00— 21 M L 11/$/00 <br /> FILE NO f PREPARED <br /> 18 M LBY Delta <br /> DODOS <br /> Source Base modified from map provided by Tom 0 Marrow Inc REVISION AVO REVIEWED BY EnrUrP•m•nt•I <br /> 21 A GanaWt•nta. Ina <br /> i <br />