Laserfiche WebLink
f <br /> I <br /> I <br /> HAMMER LANE <br /> LEGEND � <br /> MW-1 MIONITORING WELL LOCATION <br /> I. <br /> 0 VW-1 VAPOR EXTRACTION WELL LOCATION <br /> ® AS-1 AIR SPARGE LOCATION <br /> I <br /> a 56-1 SOIL BORING LOCATION <br /> DRIVEWAY DRIVEWAY <50 TPH AS GASOLINE CONCENTRATION IN MICROGRAMS PER LITER (ug/L) <br /> <05� BENZENE CONCENTRATION IN ug/L <br /> 1<2 0 Iv TBE CONCENTRATION IN ug/L <br /> Sign post — o 10 SAMPLES CLECTED ON 6/26/00 <br /> PUMP ISLAND TF9 111III111 <br /> 6-15• MW-3 <br /> <50 <br /> l ' <br /> <00 5 � <br /> <20 + <br /> Telephone •B-5 <br /> booths <br /> PUMP ISLAND VW-4 <br /> B-130 0 •B-18 <br /> AC PAVING U3 <br /> Z I <br /> MW-2 O <br /> SALES <50 O <br /> <0 5 <br /> BUILDING 1<2 0 m <br /> 0 SB1-D 0 <br /> Q VW-2 Z <br /> z Rl + <br /> r1 <br /> TS5461 MW-1 , <br /> CONCRETE <2 0 J <br /> •B-16 •B-12 r--,r--,r---, --, North <br /> m i ii VW-5S/D1 i <br /> 68-17 i T1 Ii T2 g T3 i T4 i • B-1 <br /> z i n is ® <br /> riiAS-2 ®AS-1 r� <br /> <50 L---J i i 0VW—1 n <br /> cO 5 AS-3® <br /> <2 0 <br /> MW-4 —3 11MW-5 <br /> /E 422 I <br /> 0 30 FT <br /> SVE SYSTEM COMPOUND MW-6 <br /> <50 <br /> <05 SCALE <br /> <2 O <br /> f <br /> f FIGURE 3 <br /> GROUNDWATER ANALYTICAL SUMMARY <br /> 2nd QUARTER 2000 <br /> ARCO SERVICE STATION 548 <br /> 1012 HAMMER LANE <br /> STOCKTON CALIFORNIA <br /> PROJECT NOt DRAWN BY <br /> D000-321 G K <br /> If 8/8/00 <br /> FILDNPREPARED BY <br /> Delta <br /> 00321B <br /> G K AConsultents, <br /> Source Base mod fied from map provided by Tom 0 Morrow Inc REVISION ND REVIEWED BY Inc <br /> f <br />