Laserfiche WebLink
i <br /> 06/24/02 <br /> Hammer Lane, Stockton (548) <br /> Process Readings: <br /> Catox Inlet Temperature: 689 F <br /> Catox Middle Temperature: 731 F <br /> Catox Outlet Temperature: 688 F <br /> System Air Flow: 44 CFM <br /> Well Pressures: <br /> VW-1: -7" H2O <br /> VW-2: -8" H2O <br /> VW-3: -18" H2O <br /> VW-4: -5" H2O <br /> VW-51): -47" H2O <br /> VW-55: -18" H2O <br /> Initial start of system and preheat @ 0930 Hrs. <br /> System reached operating temperature at 1035 Hrs. <br /> Sys tern Runtime Meter: 17306.4 Hrs <br /> Compressor Runtime Meter: 888.4 Hrs <br /> Electric Utility Meter: 73405 <br /> Eldorado, Stockton(2130) <br /> Process Readings: <br /> Sparge Compressor Air Out: 12 PSI <br /> Sparge Manifold Inlet: 10 PSI <br /> Sparge Manifold Outler: 5.8 PSI <br /> Electric Utility Meter: 80798 <br />