Laserfiche WebLink
i <br /> I, <br /> - I <br /> HAMMER LANE i <br /> I LEGEND: <br /> IZS - <br /> MW-1 MONITORING WELL LOCATION <br /> QQ VW-1 VAPOR EXTRACTION WELL LOCATION <br /> A AS-1 AIR SPARGE LOCATION <br /> • SB-1 SOIL BORING LOCATION <br /> DRIVEWAY DRIVEWAY ¢50 J TP11 AS GASOLINE CONCENTRATION IN MICROGRAMS PER LITER(ug1L) <br /> X0.5 BENZENE CONCENTRATION IN ug1L <br /> X1.0 MTBE CONCENTRATION IN ug]L <br /> SIGN POST-G SAMPLES COLLECTED ON 12113107 <br /> PUMP ISLANDr;c'P TPHG AND BENZENE ANALYZED USING EPA METHOD 801516020 <br /> MW-3 MTBE ANALYZED USING EPA METHOD 8260 <br /> Ir C50 <br /> L X0.50 <br /> -�D.50 J <br /> TELEPHONE <br /> BOOTHS <br /> PUMP ISLAND VW-4 ❑ <br /> 0 � <br /> C z <br /> X00.5.5 0 � <br /> 100 AC PAVING <br /> m <br /> MW-2 <br /> SALESr <50 <br /> • BUILDING . <br /> 50 <br /> W 1 <br /> V <br /> -2 1-33 <br /> � Q <br /> • rr 180Z <br /> QL2.6 � M <br /> 1.5 X <br /> MW-1 <br /> 75 43 <br /> 540 <br /> CONCRETE .9 <br /> 1,900 I - <br /> r--�r--it---i -- <br /> 1 <br /> lbfffi <br /> 1i1��� I I 1 1 I <br /> -p I rVIW-4 <br /> ry I T1 1IT2 ST3 i T4 <br /> z <br /> Z 5[r, <br /> 14L <br /> I I__JL__J;AS-2i i i ®AS-1 <br /> B7L«_J I I • VW-1 <br /> AS-3® I Ol j <br /> MW-4 VW-3 2.5 MW-5 <br /> ['�<05"00 <br /> O <D-so` 87 a5D <br /> IE 180 f <050 <br /> O 30 FT <br /> SVE SYSTEM COMPOUND BMW's <br /> `50 SCALE <br /> 21 <br /> FIGURE 3 <br /> GROUNDWATER ANALYTICAL SUMMARY <br /> 4th QUARTER 2001 <br /> ARCO FACILITY NO. W <br /> 1612�HAMMER LANE <br /> STOCKTON,CALIFORNIA <br /> PROJECT NO. DRAWN BY <br /> 2000-321 K.N.0210402 <br /> FILE NO. PREPARED BY D e! t a <br /> Source: Base modified from ma00327B M.L. <br /> p prgv}ded by Tam O.Morrow,Inc.irKREVISION NO, REVIEWED BY i:nVlrOnl7lEntal <br /> 1 " CDnsultants, Inc. <br />