My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:50:48 PM
Creation date
1/30/2020 3:52:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 5 <br /> I don't have time right now to check the concentrations found in groundwater collected from the various wells. <br /> Please submit the work plan and I will review everything at that time. <br /> Thank you. <br /> Vicki McCartney, Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton, California 95202 <br /> Phone: (209)468-9852 <br /> Fax: (209)468-3433 <br /> Email: v_.mccartney(n)sjeeh com <br /> From: Yan, Jose [mailto:Jose.Yan@stantec.com] <br /> Sent: Tuesday, October 18, 20113:15 PM <br /> To: Vicki McCartney [EH] <br /> Cc: Francini, Catherine <br /> Subject: RE: Well Destruction - BP 11193 (3202 W Hammer Ln, Stockton, CA) <br /> Hello Vicki, <br /> I would like to verify that this is the latest MFR form: http;//www sjgov o.ra/...ehd/d.acs/MFR-UNIT`/`2...01V.Ddf. <br /> Also, does SJCEHD have instructions/template on how to complete the MFR?. <br /> We received a letter yesterday from the CRWQCB concurring with SJCEHD closure recommendations, <br /> please see attached. Please verify that this is the correspondence you are looking for and if we could <br /> proceed with the well destruction project. <br /> We plan on submitting the well destruction work plan along with the permit applications, check, and access <br /> agreements. The City of Stockton encroachment permit for three right-of-way wells would not be ready as <br /> we plan on submitting this at the same time as the well destruction permit applications—will SJCEHD be <br /> able to process the permit application without the encroachment permit? <br /> Lastly, please confirm that the following methodologies are acceptable to SJCEHD for destroying the 23 <br /> wells. We plan on including these on our work plan. <br /> Based on the San Joaquin County Well Standards section 13.17.6: "if the well construction is unknown <br /> and/or is located in an area of known or suspected pollution or contamination, the well shall be destroyed <br /> by removing all material within the original borehole (including the well casing, screen, filter pack, and <br /> annular seal); and the created hole filled completely with appropriate sealing material." <br /> Based on the 2Q11 QMR (see attached), MW-4, MW-7, and MW-9 are wells with MTBE above the <br /> laboratory MRL (with only MW-9 above the 13 ug/L MCL). MTBE for the rest of the monitoring wells are <br /> below the laboratory MRL. Additionally, injection wells OS-1 through OS-10 are located in the area where <br /> the MTBE plume is not suspected. Considering these, the following is proposed: <br /> 1. Pressure-grout casing, air-knife to 3 ft bgs (section 13.17.12), cut casing to 3.5 ft bgs (section <br /> 13.17.12), form a mushroom cap (section 13.17.13), backfill with clean soil (section 13.17.14), and <br /> resurface borehole to match existing surface for wells MWA R, MW-2R, MW-3 through MW-8, MW- <br /> 10, MW-11, MW-13, VW-1, and OS-1 through OS-10. <br /> 2. Air-knife, over-drill, grout to 1 ft bgs, and resurface borehole to match existing surface for well MW- <br /> 9 <br /> 10/19/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.