Laserfiche WebLink
Former BP Service Station No. 11193 Page 3 <br /> 3202 West Hammer Lane September 29, 2011 <br /> Stockton, California 95209 <br /> conducting a survey of wells and surface water bodies within a 2,000-foot radius <br /> of the site. <br /> 12/16/99 Date of Surface Water and Water Well Survey and CPT Investigation Report <br /> submitted by Cambria Environmental Technology, Inc. that described the results <br /> of the surface water and water well survey, and the soil and groundwater <br /> analytical results from the advancement of CPT borings CB-1 through CB-6 and <br /> the electronic soil logging of CPT borings CB-2E and CB-4E. Report available <br /> on Questys, file XR0002988. <br /> 02/25/00 Date of Supplemental Investigation Work Plan submitted by Cambria <br /> Environmental Technology, Inc. that proposed the destruction of damaged well <br /> MW-2, replacement of MW-1 and MW-2, installation of additional monitoring <br /> wells, advancement of one deep soil boring for vertical delineation of petroleum <br /> hydrocarbon contamination, an evaluation of the pumping effects of the nearby <br /> Caltrans irrigation well and a plan for contaminant migration control. <br /> 04/19/00 Date of Interim Migration Control Plan submitted by Gettler-Ryan Inc. proposing <br /> the weekly removal from MW-1 and MW-2 of a total of approximately 5,000 <br /> gallons of groundwater to limit the migration of petroleum hydrocarbon-impacted <br /> groundwater and reduce the contaminant concentrations. <br /> 05/24/00 Date when a groundwater sample was collected from the Caltrans irrigation well. <br /> 06112-13100 Dates when MW-1 R, MW-2R, MW-8, MW-9, and MW-10 were installed. <br /> 06/16/00 Date when batch extraction began and approximately 5,000 gallons of <br /> groundwater were purged weekly from MW-1 R. Batch extraction included <br /> purging groundwater from MW-2R and VW-1. <br /> 10/13/00 Date of Supplemental Investigation Report submitted by Cambria Environmental <br /> Technology, Inc. that described the destruction of MW-2, installation of <br /> replacement wells MW-1 R and MW-2R, and new wells MW-8 and MW-9 on-site, <br /> and MW-10 off-site; and reported the analytical results from the collection of soil <br /> samples from the well installations and groundwater samples collected from the <br /> Caltrans well and newly installed monitoring wells. Cambria Environmental <br /> Technology, Inc. also reported that approximately 91 pounds of gasoline and 55 <br /> pounds of methyl tertiary-butyl ether (MTBE) were estimated to remain in soil and <br /> approximately 4 pounds of gasoline and 11 pounds of MTBE were estimated to <br /> remain in groundwater beneath the site; and the Caltrans well had been <br /> destroyed. Report available on Questys, file XR0002982. <br /> 10/29/01 Date of Work Plan for 5-Day Dual Phase Extraction submitted by SECOR <br /> International Incorporated proposing the extraction of soil vapor and groundwater <br /> simultaneously from MW-2R and VW-1. <br /> 11126-30101 Dates when a five-day dual-phase extraction (DPE) test was conducted by <br /> SECOR International Incorporated. <br />