My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:50:48 PM
Creation date
1/30/2020 3:52:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former BP Service Station No. 11193 Page 3 <br /> 3202 West Hammer Lane September 29, 2011 <br /> Stockton, California 95209 <br /> conducting a survey of wells and surface water bodies within a 2,000-foot radius <br /> of the site. <br /> 12/16/99 Date of Surface Water and Water Well Survey and CPT Investigation Report <br /> submitted by Cambria Environmental Technology, Inc. that described the results <br /> of the surface water and water well survey, and the soil and groundwater <br /> analytical results from the advancement of CPT borings CB-1 through CB-6 and <br /> the electronic soil logging of CPT borings CB-2E and CB-4E. Report available <br /> on Questys, file XR0002988. <br /> 02/25/00 Date of Supplemental Investigation Work Plan submitted by Cambria <br /> Environmental Technology, Inc. that proposed the destruction of damaged well <br /> MW-2, replacement of MW-1 and MW-2, installation of additional monitoring <br /> wells, advancement of one deep soil boring for vertical delineation of petroleum <br /> hydrocarbon contamination, an evaluation of the pumping effects of the nearby <br /> Caltrans irrigation well and a plan for contaminant migration control. <br /> 04/19/00 Date of Interim Migration Control Plan submitted by Gettler-Ryan Inc. proposing <br /> the weekly removal from MW-1 and MW-2 of a total of approximately 5,000 <br /> gallons of groundwater to limit the migration of petroleum hydrocarbon-impacted <br /> groundwater and reduce the contaminant concentrations. <br /> 05/24/00 Date when a groundwater sample was collected from the Caltrans irrigation well. <br /> 06112-13100 Dates when MW-1 R, MW-2R, MW-8, MW-9, and MW-10 were installed. <br /> 06/16/00 Date when batch extraction began and approximately 5,000 gallons of <br /> groundwater were purged weekly from MW-1 R. Batch extraction included <br /> purging groundwater from MW-2R and VW-1. <br /> 10/13/00 Date of Supplemental Investigation Report submitted by Cambria Environmental <br /> Technology, Inc. that described the destruction of MW-2, installation of <br /> replacement wells MW-1 R and MW-2R, and new wells MW-8 and MW-9 on-site, <br /> and MW-10 off-site; and reported the analytical results from the collection of soil <br /> samples from the well installations and groundwater samples collected from the <br /> Caltrans well and newly installed monitoring wells. Cambria Environmental <br /> Technology, Inc. also reported that approximately 91 pounds of gasoline and 55 <br /> pounds of methyl tertiary-butyl ether (MTBE) were estimated to remain in soil and <br /> approximately 4 pounds of gasoline and 11 pounds of MTBE were estimated to <br /> remain in groundwater beneath the site; and the Caltrans well had been <br /> destroyed. Report available on Questys, file XR0002982. <br /> 10/29/01 Date of Work Plan for 5-Day Dual Phase Extraction submitted by SECOR <br /> International Incorporated proposing the extraction of soil vapor and groundwater <br /> simultaneously from MW-2R and VW-1. <br /> 11126-30101 Dates when a five-day dual-phase extraction (DPE) test was conducted by <br /> SECOR International Incorporated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.