My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002929
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
ARCHIVED REPORTS_XR0002929
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 5:29:21 PM
Creation date
1/30/2020 3:59:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002929
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E C 0 R <br /> r 76 Station No. 11193 <br /> August 13, 2004 <br /> Page 8 <br /> CONCLUSION AND RECOMENDATIONS <br /> Ozone sparge well and system installation activities have been completed. The ozone <br /> sparge system has been put into operation and monthly operation and maintenance is <br /> being performed. Quarterly reports documenting the performance of the OS system are <br /> submitted quarterly. They include a summary of remediation system performance, and an <br /> evaluation of dissolved petroleum hydrocarbon concentrations detected in groundwater <br /> monitoring wells to determine whether OS is an effective technique for reducing/removing <br /> petroleum hydrocarbons in soil and groundwater beneath the site. <br /> Site groundwater monitoring and sampling will continue to be performed on a quarterly <br /> basis using the existing well network. SECOR will produce quarterly groundwater <br /> monitoring and system efficiency reports summarizing field and analytical data. <br /> The off-Site monitoring wells described in the September 15, 2003 work plan will be <br /> installed in a separate phase of field work. This installation is anticipated to take place in <br /> September. <br /> If there are any questions, please call us at (916) 861-0400. <br /> Sincerely, <br /> SECOR International, Incorporated 0 GE <br /> CD <br /> D�Oc <br /> M.CAVAN HSHRICH <br /> Mya R ell M. Gavan Heinrich R.G. <br /> Project Geologist Associate Geologist N� 7574 <br /> �7 '0 a)1164. <br /> OF CA��� �- <br /> Attachments: Figure 1 — Site Location Map <br /> Figure 2—Site Plan with OS System Layout <br /> Table 1 —Ozone Well Construction Details <br /> Attachment 1 — Boring Logs <br /> Attachment 2— Certified Laboratory Analytical Report and Chain-of-Custody <br /> Documentation <br /> cc: Liz Sewell, ConocoPhillips <br /> Paul Supple, BP <br /> �t.e <br /> I:1ConocoPhillips\Tosco Marketing1111931Reports\Ozone Well install Rpt 6-04 recovered.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.