Laserfiche WebLink
1,r ,ALL MONITORING DATA SHEET <br /> Project # da ( 6/ Client. P <br /> * Sampler C (- e,0 Start Date 62'0� <br /> Well I.DWell Diameter. 2 3 4 6 8 <br /> Total Well Depth- �� r Depth to Water. C 3 <br /> Before After Before After <br /> Depth to Free Product Tluckness of Free Product (feet) <br /> Referenced to V Grade D O Meter (if req'd). YSI HACH <br /> Purge Method Sampling Method Bailer <br /> Sailer Waters Disposable Bailer <br /> Disposable Bail eristaltic Extraction Port <br /> Middleburg Extraction Pump Dedicated Tubing <br /> Electric Submersible Other other <br /> Well Diameter Multiplier Well Dtameter Multi her <br /> !� � 1" 004 4" 065 <br /> dL "� (Gals)X — Gals 2" 016 6" 147 <br /> l Case Volume Specified Volumes _ Calculated Volume 3• 037 Other radius'•0163 <br /> Time Temp CF) pH Cond Turbidity Gals Removed Observations <br /> (2 0D 9L 0 <br /> Did well dewater? Yes o Gallons actually evacuated 3� 7 <br /> Sampling Time Lb V Sampling Date <br /> Sample I D (Y)jej— Laboratory. <br /> Analyzed for- x- Tl✓ TB TPH-D Other <br /> Equipment Blank I.D : @ ��� Duplicate I.D . <br /> Analyzed for: TPH-G BTEX MTBE TPH-D Other <br /> D O (if req'd) Pre-purge mg/L Post-purge mg/L <br /> ORP (if req'd) Pre-purge mV Post-purge mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />