Laserfiche WebLink
ARCO AM/PM <br /> SERVICE STATION F <br /> ' I <br /> N <br /> PRIVATE ROAD <br /> W 0 30 60 <br /> z <br /> SCALE IN FEET <br /> w LEGEND <br /> $ GROUNDWATER MONITORING WELL <br /> MW-4 SERVICE (lcQ (-1 1 .81 ) GROUNDWATER ELEVATION IN <br /> (-1 1 .54) STATION MW-3 = FEET ABOVE MEAN SEA LEVEL <br /> F I BUILDING (-11 .57) <br /> I.- -1 1 .80 GROUNDWATER ELEVATION <br /> CONTOUR IN FEET ABOVE <br /> Ld MEAN SEA LEVEL <br /> L J DISPENSER / / (CONTOUR INTERVAL-0.10 FOOT) <br /> —11 6,0 ISLANDS / / (MW1 .SD) CALCULATED GROUNDWATER <br /> UNDERGROUND 0.001 GRADIENT DIRECTION AND <br /> USED OIL TANK / I MAGNITUDE IN FOOT PER FOOT <br /> 1 Ld <br /> 3 / <br /> i lg�MW--2 MW-5 <br /> (-11 .63) 0(-11 ,62) a <br /> I � I <br /> MW-1�UNDERGROUND <br /> (-1 1 .60) FUEL TANKS / <br /> pLANTER / <br /> DRIVEWAY <br /> DRNEWAY '�N�0 <br /> TRANSFORMER <br /> FIGURE 2 <br /> POTENTIOMETRIC GROUNDWATER <br /> ELEVATION CONTOUR MAP <br /> JULY 20, 1995 <br /> BP OIL SERVICE STATION NO. 11193 <br /> (MW-6 3202 WEST HAMMER LANE <br /> .81 ) STOCKTON, CALIFORNIA <br /> PROJECT NO. 10-136 <br /> � 9 <br /> I <br /> �AL1STO ENGINEERING GROUP <br /> WALNUT CREEK, CALIFORNIA m <br /> e <br />