Laserfiche WebLink
ALISTO Field Report / Sampling Data Sheet <br /> ENGINEERING Project No. 10-136-07-004 Date: <br /> GROUP Address 3202 W. Hammer Lane Day: M T W T F <br /> 1575 TREAT BOULEVARD, SUITE 201 Contract No. Pending City: Stockton <br /> WALNUT CREEK CA 9459$ 925 295-1650 FAX 295-1823 Station No. BP 11193 <br /> Sampler: <br /> DEPTH TO GROUNDWATER SUMMARY <br /> WELLFSAMPLE WELL TOTAL DEPTH TO PRODUCT TIME COMMENTS: l� t <br /> IDDIAM DEPTH WATER THICKNESS MONITORED DBA: bMW-1 201 31.90 <br /> MW-2 s —S 2" 31.50 <br /> MW-3 2" 30.48 SEMI/ <br /> MW-4 2" 33.90 ?� . �� 3 Q ANNUAL/DO NOT SAMPLE <br /> MW-5 S — 2" 30.80 L� L rc Lc <br /> MW-6 2" 29.57 1 �b <br /> MW-7 2" 29.03 12, 30 '3 ANNUAL/DO NOT SAMPLE <br /> FIELD INSTRUMENT CALIBRATION DAT <br /> pH METER 4.00 7.00 10,00_L!�D TEMPERATURE COMPENSATED / Y N TIME S� WEATHERq <br /> D.O. METER _ ZERO d,0. SOLUTION BAROMETRIC PRESSURE TEMP-- <br /> CONDUCTIVITY METER 10,000 TURBIDITY METER 5,0 NTU OTHER <br /> LEAK DETECTOR : ALARM MODE NON ALARM MODE <br /> Well 1D Depth to Wate Diam 40YEOCA Product Dept Iridescence Gal. 1 Time Temp *F pH E.C. D.O. O EPA 601 <br /> TPH-G/BTEX_ <br /> Total Depth-Water Level= x Well Vol.F ctor= x#v I.to Purge PurgeVoi. r <br /> �. . � •1 (0 , <br /> �TPH Diesel <br /> — <br /> itt o = go p 5 i <br /> 0 TOG 5520 <br /> Purge Method: urface Pump ODisp.Tube OWinch ODisp. Baller(s)_OSys Port TIME/SAMPLE ID <br /> Comments: ,r <br /> PAGE OF <br />