Laserfiche WebLink
ALISTO Field Report / Sampling Data Sheet <br /> ENGINEERING Project No. 10-136-06-004 Date: S1aoZ ��'� <br /> GROUP Address 3202 W. Hammer Lane Day: M T W( I�- F <br /> 1575 TREAT BOULEVARD, SUITE 201 Contract No. G797415 city: Stockton <br /> WALNUT CREEK CA 94598 510 295-1650 FAX 295-1823 Station No. BP 11193 Sam ler: <br /> DEPTH TO GROUNDWATER SUMMARY <br /> WELL SAMPLE WELL TOTAL DEPTH TO PRODUCT TIME COMMENTS: ANNUAL/NOVEMBER <br /> ID ID DIAM DEPTH WATER THICKNESS MONITORED <br /> MW-1 .5 r 2" 31.90 \1 5-5 <br /> MW-2 2" 31.50 S -L,p (' [,- s -(o) YL% Ad <br /> MW-3 - 2" 30.48 \ �0 SEMI <br /> MW-4 /V C'j 2" 33.90 ANNUAL <br /> MW-5 s- 2" 30.80 o <br /> MW-6 ,s - 4 2" 29.57 L4 X13Q <br /> MW-7 2" 29.03 ANNUAL <br /> FIELD INSTRUMENT CALIBRATION DATA <br /> pH METER 4.00 7.00 10.00-Lo TEMPERATURE COMPENSATED Y N TIME ISD WEATHER <br /> D.O. METER ZERO d.0. SOLUTION BAROMETRIC PRESSURE ��O_ TEMP�3 <br /> CONDUCTIVITY METER _7L""-_ 10,000 TURBIDITY METER 5.0 NTU OTHER <br /> LEAK DETECTOR : ALARM MODE_ NON ALARM MODE <br /> Well ID Depth to Wate Diam Cap/Lock Product Depi Iridescence Gal. Time Temp "F pH E.C. D.O. 0 EPA 601 <br /> M,LJ t [Z.3u1 1t O << Y le 9O TPH-G/BTEX _ <br /> Total Depth-Water Level= x Well Vol.Factor= x# oL to Purge PurgeVol, t q 7_1 �.0Z.,J O TPH Diesel <br /> — <br /> 3)C=1 .�3)C Ato= .� to 3x3`: , Z$ WI l .r1 O TOG 5520 <br /> Purge Method: OSurface Pump ODisp.Tube OWinch ODlsp.Bailer(s)—OSys Port TIME/SAMPLE ID <br /> Comments: l5-0 <br /> Well ID Depth to Watei Diam Cap/Lock Product Depi Iridescence Gal. Time Temp *F pH E.C. D.O. 0 EPA 601 <br /> t.J q 1 Y 7N <br /> $'M TPH-G/BTEX-}C.(. <br /> Total Depth-Water Level= x Well Vol.Factor= x#vol,to Purge. PurgeVol. "S. O TPH Diesel <br /> O TOG 5520 . <br /> Purge Method: OSurface Pump ODisp.Tube OWinch ODisp.Bailer(s) OSys Port TIME/SAMPLE ID <br /> Comments: <br /> PAGE OF <br />