Laserfiche WebLink
• ARCO AM/PM <br /> SERVICE STATION <br /> PRIVATE ROAD <br /> 0 30 60 <br /> SCALE IN FEES' <br /> LEGEND <br /> MW-4 Lu $ GROUNDWATER MONITORING WELL <br /> (-8.07) SERVICE � ' <br /> STATION MW-3 (-8.04) GROUNDWATER ELEVATION IN <br /> F BUILDING (-7.95) Z FEET ABOVE MEAN SEA LEVEL <br /> I I , i —8.00 GROUNDWATER ELEVATION <br /> CONTOUR IN FEET ABOVE <br /> L J DISPENSER <br /> ISLANDS \ W MW-7 <br /> (CONTOUR INTERVAL-0.10 FOOT) <br /> UNDERGROUND � (-8.09) CALCULATED GROUNDWATER <br /> USED OIL TANK - ` 1 ; Q 0.001 MAGNITUDE <br /> DZINE FOOT PER FOOT <br /> 8 00 I = <br /> I MW-2 _ 3 Ld <br /> 3 <br /> 4 4 (-8.04) <br /> � <br /> ; rICA <br /> fq <br /> MW--1 \-UNDERGROUND f / <br /> (-8.04) `FUEL TANKS <br /> PLAN-TER <br /> DRIVEWAY / <br /> DRNEWAY /op i <br /> TRANSFORMER <br /> \ .'o / i FIGURE 2 <br /> 0000 POTENTIOMETRIC GROUNDWATER <br /> ELEVATION CONTOUR MAP <br /> MARCH 11 , 1997 <br /> BP OIL SERVICE STATION NO. 11193 <br /> 3202 WEST HAMMER LANE R <br /> MW-6 STOCKTON, CALIFORNIA s <br /> . PROJECT NO. 10-136 <br /> I <br /> w <br /> ALISTO ENGINEERING GROUP <br /> WALNUT CREEK, CALIFORNIA <br /> s <br /> r <br />