My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
ARCHIVED REPORTS_XR0002987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:25:44 PM
Creation date
1/30/2020 4:53:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002987
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ r <br /> 11 <br /> ep <br /> t I <br /> Y <br /> ARCO AM/PM <br /> . SERVICE STATION <br /> I <br /> I SCALE (FT) <br /> PRIVATE ROAD <br /> 0 3a <br /> MW-3 I <br /> g < 1 0 MW-7 I <br /> T <10 B < 10 <br /> MW-4 E < 1 0 T < 1 0 <br /> B <1 0 X < 1 0 E < 1 0 <br /> T < 1 0 TPHg 1000 X < 1 0 <br /> E <1 0 SERVICE TPHg <50' <br /> X <1 0 MW-4 STATION MTBE 1 100 MW-3 � Z <br /> TPHg <50 �{ BUILDING Q MTBE 3 7 <br /> MTBE 4 0 I I J <br /> L J DISPENSER Of MW-7 I <br /> ISLANDS Ld <br /> � I <br /> UNDERGROUND f <br /> USED OIL TANK Q , EXPLANATION <br /> 2 <br /> 0 1 MONITORING WELL <br /> _ a TPHg TOTAL PETROLEUM HYDROCARBON CALCULATED <br /> l MW-2 Luw AS GASOLINE IN PARTS PER BILLION (ppb) <br /> MW-5 81 BENZENE, ppb <br /> 4 l NA T TOLUENE, ppb <br /> I E; ETHYLBENZENE, ppb <br /> l l _ X ' XYLENE, ppb <br /> L _ , —� MW-5 MTBE I METHYL—TERT—BUTYL—ETHER, ppb <br /> B < 1 0 NA <br /> NA DATA NOT AVAILABLE <br /> MW-1 �UNDERGROUND <br /> FUEL TANKS < 1 0 <br /> PLANTER E <1 0 1 <br /> DRIVEWAY X <1 0 <br /> TPHg 610 <br /> MTBE 640 <br /> „RIv�wA'� VW- 1 <br /> TRANSFORMER B 650 MW-6 <br /> T <50 B < 1 0 ; <br /> E 81 T < 1 0 <br /> X <50 E <1 0 <br /> TPHg 34000 X <1 0 <br /> MTBE 44000 TPH9 <50 1 <br /> MTBE 29 j <br /> r <br /> I <br /> MW--6 I <br /> 1 , PREPARED BY HYDRO RBON CONCENTRATION MAP <br /> FIGURE. <br /> ,) CII OCTOBER 14, 1999 <br /> Pam BP COIL Service Station No 11193 2 <br /> 3202 West Hammer Lane PROJECT: <br /> Ref 11193bteeewg engineering contracting firm Stockton, California DAC04 <br /> 8c>temop from Aheto Engmeenng WPUP ' <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.