Laserfiche WebLink
• CPT Investigation Work Plan <br /> BP Oil Site No 11193 <br /> C A M B R I A Stockton, California <br /> August 12, 1999 <br /> Soil and Water Dssposal/Recychng Soil and water produced during drilling activities will be <br /> temporarily stored on site Following review of analytical results, the soil and water will be <br /> transported to an appropriate facility for disposal/recycling <br /> Reporting After the analytical results are received, a subsurface investigation report will be prepared <br /> that, at a minimum, will contain <br /> • Descriptions of the soil sampling, CPT sounding and groundwater sampling methods, <br /> • Boring logs, <br /> • Tabulated soil and groundwater analytical results, <br /> • Analytical reports and chain-of-custody forms, and <br /> • Soil and water disposal methods <br /> Surface Water and Water Well Survey <br /> A survey of wells and surface water bodies within a 2,000—foot radius of the site will be conducted <br /> The well data will be requested from the California Department of Water Resources Additional well <br /> data will be requested from municipal water suppliers and nearby industries Surface water bodies <br /> will be identified based on the review of topographic maps The results of this survey will be included <br /> in the investigation report <br /> 5 <br />