My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:06:43 AM
Creation date
1/31/2020 8:38:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thanks Vicki and Sarah. <br /> Jim Barton <br /> James L.L. Barton, P.G. <br /> Engineering Geologist <br /> California Regional Water Quality Control Board Central Valley Region, 11020 Sun Center <br /> Drive, Suite. 200, Rancho Cordova, CA 95670 office. (916) <br /> 464-4615 <br /> fax (916) 464-4704 <br /> To comply with the Governor's order calling for. furloughs, . specific staff of the Central <br /> Valley Regional Water Control Board Office and offices of the California,--Environmental <br /> Protection Agency are required to take. three furlough days off every month.. I apologize <br /> for any inconvenience this may cause. <br /> >>> Sarah Salcedo <ssalcedo@stratusinc.net> 11/23/2010 12 :54 PM >>> <br /> Good morning again Jim - <br /> I'm sorry to add this to your. work .stack since I know you're getting ready to leave for a <br /> few weeks. :-) Wanted to open lines of communication a bit on it though-- I got an email. <br /> from Vicki McCartney at SJCEHD (cc'd here also) , who. manages this case,.. yesterday saying. <br /> you and shed had been in communication on this case recently and was wondering what the <br /> status was on the ozone injection pilot testing. As you,, probabl_y -already read in the cc <br /> copies *documents 'I've 'sent you on.-mthis :case in .last: 6 :months, ;,vie .met with 'SJCEHD. in May' <br /> 2010 and''we discussed how to get 'this•site into an ozone remediation-testing phase asR <br /> there had been a lot -of back-and-forth on getting_RWQCB approval on it. As you may <br /> remember, this site adjoins a BP/CP site that- has been under ozone injection remediation <br /> for 5+ years. We have previously submitted documents to -SJCEHD%. illustrating' similarkt ;. c� � <br /> hydrogeologic conditions at the two adjacent parcels. ' Iriour meeting,. we discussed with <br /> SJCEHD several instances in which RWQCB has allowed ozone-,pilot-scale without ozone-bench,,` ?%.-• r-. <br /> testing or WDR application, in the event that`-a- detailed','monitoking' plan And'contingenty— <br /> plan are in place for the pilot testing. Stratus has done ozonepilot-scale without a WDR <br /> permit or bench-testing at sites approved by Vera Fischer (3900 Fruitridge, Sac) and <br /> Kristi Shelton (Ramos plant in Isleton) . <br /> Considering the already-altered geochemical state (if, it was going to happen at all) of <br /> the subsurface by the BP/CP ozone system, SJCEHD approved us to. submit a work plan for the <br /> testing (including monitoring and contingency_plans) . This work plan was submitted to SJC <br /> and you on June 22; SJCEHD approved the work plan in a letter. dated July 21 but their <br /> approval was contingent on your approval. If- you have not already reviewed the work plan <br /> that was submitted to you in June,. could you please do that and provide your input on our <br /> proceeding when you can.. <br /> For your convenience, I have attached the docs- here so you don't have to go hunting for. <br /> them. I understand this'll have to .wait for. your return in December - hope you have, a <br /> happy Thanksgiving! <br /> -sarah <br /> Sarah O.. Salcedo, P.G. ; <br /> Project Manager / Senior. Geologist <br /> Stratus Environmental, Inc. <br /> 3330 Cameron Park Drive, Suite 550 <br /> Cameron Park, California 95682 <br /> (530) 313-9966 -- office <br /> 3 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.