My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:06:43 AM
Creation date
1/31/2020 8:38:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vicki McCartney [EH] <br /> From: Sarah Salcedo [ssalcedo@stratusinc.net] <br /> Sent: Tuesday, January 18, 2011 10:53 AM <br /> To: 'Jim Barton' <br /> Cc: Vicki McCartney[EH]; 'Allan Dudding' <br /> Subject: RE: Parkinson ARCO-3250 W. Hammer Lane in Stockton <br /> Good morning Jim- Thanks so much,for your quick review and .response to our NOI and MRP: <br /> Regarding the NOI, I will amend the application with the CEQA info you provided and mail a <br /> paper hardcopy to your attention with Wes Parkinson's original signature: Regarding the <br /> MRP, I reviewed your modifications to my draft MRP (via track-change-MSWord format) and <br /> Stratus accepts all changes made by RWQCB'. We `will now proceed with the. approved pilot <br /> test, per the SJCEHD-approved work plan. I'll keep both you and Vicki informed on our <br /> progress. Thanks again, -sarah <br /> -----Original Message----- <br /> From: Jim Barton [mailto:jbarton@waterboards.ca.gov] <br /> Sent: Tuesday, January 18, 2011 9:37 AM <br /> To: Sarah Salcedo <br /> I!i Cc: 'Vicki McCartney [EH] ' <br /> Subject: RE: Parkinson ARCO - 3250 W._ Hammer Lane in -Stockton <br /> Hi Sarah, <br /> My first email contained comments to the Notice of Intent (application form) in <br /> GeoTracker, which needs to be mailed to me with the original signature. <br /> This email contains my edits (track changes in MS Word) to the draft Monitoring and <br /> Reporting Program for the injection permit. If, Stratus accepts the changes to finalize <br /> them, then I will allow the pilot study to proceed prior to issuance of the permit. I <br /> will review the pilot study report to see if a permit is needed at a future date. <br /> Please note that the San Joaquin County Environmental Health Department is the lead <br /> regulatory agency for the case, and will review and provide approval for the technical <br /> aspects of the cleanup. The Regional Board is providing the permit for the injections. <br /> Thanks. <br /> Jim Barton <br /> James L.L. ,Barton, P.G. <br /> Engineering Geologist. <br /> California Regional Water Quality Control Board Central Valley :Region, 11020 Sun Center <br /> Drive, Suite 200, Rancho Cordova, CA 95670 office (916) 464-4615 <br /> fax (916) 464-4704 <br /> To comply with the Governor's order calling for furloughs, specific staff of the Central <br /> Valley Regional Water. Control Board Office and offices of the California Environmental <br /> Protection Agency are required to take three furlough days off every month.. I apologize <br /> for any inconvenience this may cause. <br /> > Sarah Salcedo <ssalcedo@stratusinc.net> 1/13/2011 5:18 PM >>> <br /> Hey there Jim- As you requested, I have completed the NOI application and a draft MRP and <br /> uploaded this document with a cover letter to GeoTracker today (and mailed you a <br /> hardcopy) . Please find attached here the .doc Word version of the MRP portion so that you <br /> may edit as needed. Please let me know when you've reviewed the info and whether we may <br /> proceed with the remediation pilot test without the full WDR permit. <br /> Thanks much, have a good one! <br /> -sarah <br /> Sarah 0. Salcedo, P.G. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.