Laserfiche WebLink
a <br /> for 5+ years. We have previWsly submitted documents to SJCEillustrating similar <br /> hydrogeologic conditions at the two adjacent parcels. In our meeting, we discussed with <br /> SJCEHD several instances in which RWQCB has allowed ozone pilot-scale without ozone-bench <br /> testing or WDR application, in the event that a detailed monitoring plan and contingency j <br /> plan are in place for the pilot testing. Stratus has done ozone pilot-scale without a WOR <br /> permit or bench-testing at sites approved by Vera Fischer (3900 Fruitridge, Sac) and <br /> Kristi Shelton (Ramos plant in Isleton) . Considering the already-altered geochemical <br /> state (if it was going to happen at all) of the subsurface by the BP/CP ozone system, <br /> SJCEHD approved us to submit a work plan for the testing (.including monitoring and <br /> contingency plans) . This work plan was .submitted to SJC and you on June 22; SJCEHD <br /> approved the work plan in a letter dated July 2'l but their approval was contingent on. your <br /> approval. If you have not already reviewed the work plan that was submitted to you in <br /> n ur roceediri when you can. <br /> June, could you please do that and provide your input o o p g <br /> For your convenience, I have attached the docs here so you. don't have to go hunting for <br /> them. I understand this'll have to wait for your return in December - hope you have a <br /> happy Thanksgiving! <br /> -sarah <br /> Sarah O. Salcedo, P.G. <br /> Project Manager / Senior Geologist <br /> Stratus Environmental, Inc. <br /> 3330 Cameron Park Drive, Suite 550 , <br /> Cameron Park, California 95682 <br /> (530) 313-9966 -- office <br /> (530)676-6005 -- fax <br /> (775) 343-2295 -- mobile <br /> I <br /> 3 i <br />