My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:06:43 AM
Creation date
1/31/2020 8:38:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 15,2010 <br /> PARKINSON'S HAMMER 1-5 ARCO <br /> QUARTERLY STATUS UPDATE REPORT <br /> Facility Address: 3250 West Hammer Lane, Stockton, California <br /> Consulting Co./Contact Person: Stratus Environmental, Inca/Sarah O. Salcedo, P.G. <br /> Consultant Project No: 2046-3250-01 <br /> Primary Agency/Regulatory ID No: Victoria McCartney, San Joaquin County Environmental Health <br /> Department(SJCEHD),/Site Code No. 2224 <br /> WORK PERFORMED THIS QUARTER(Third 2010): <br /> 1. In accordance with SJCEHD-approved -reduced groundwater monitoring and sampling plan, no <br /> --� ~---- — —groundwater-mon itor-ing-orsampling.activities were.conducted,during.the.third quarter 2010. <br /> 2. Received SJCEHD correspondence dated July 21, 2010 regarding the Work Plan for Pilot-Scale <br /> 03IH2O2 Injection Test, dated June 22, 2010. In this letter, SJCEHD approved of the scope of work <br /> included in the work plan, but requested that RWQCB's approval be obtained prior to implementing <br /> the plan. <br /> i <br /> WORK PROPOSED FOR NEXT QUARTER(Fourth 2010): <br /> 1. Proceed with implementation of the 90-day 03/H2 02 injectionpilot test, once RWQCB concurrence <br /> of the work plan is received. <br /> 2. Conduct semi-annual groundwater monitoring and sampling activities. During this event, wells <br /> MW-1, MW-2, and MW-5 will be gauged, purged, and sampled. Groundwater samples will be <br /> analyzed at a state-certified analytical laboratory for gasoline range organics (GRO), by EPA <br /> Method SW8015B/DHS LUFT Manual, and for benzene, toluene, ethylbenzene, and total xylenes <br /> (BTEX) and methyl tert-butyl ether (MTBE) and tertiary butyl alcohol (TBA) by EPA Method <br /> SW8260B. Coordinated sampling with the adjacent former BP-site, located at 3202 Hammer Lane, <br /> is planned. <br /> Current Phase of Project: Groundwater Monitoring _ <br /> Frequency of Groundwater Monitoring: All Wells=Semi-annually(2"d&4th quarters) <br /> Frequency of Groundwater Sampling: Wells MW-1, -2, -5 =Semi-annually(2nd&4th quarters) <br /> j Wells MW-3 -4 -6 = Every 2 years(next 2Q2011) <br /> Groundwater Sampling Date: No monitoring/sampling 3Q10 <br /> Is Free Product(FP) Present on Site: No . <br /> Depth to Groundwater: No monitoring/sampling 3Q10 <br /> Groundwater Flow Direction and Average Gradient: No monitoring/sampling 3Q10 <br /> ATTACHMENTS: (none) <br />,III <br /> K:\Parkinsons Hammer 1-5 Arco\Quarter1y\2010\Parkinson's Hammer 3Q10.D0C STRATUS <br />
The URL can be used to link to this page
Your browser does not support the video tag.