My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:06:43 AM
Creation date
1/31/2020 8:38:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> ?•••=_-:�� '9 Donna Heran,REHS <br /> 600 East Main Street: <br /> Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Robert McClellon,REHS <br /> Jeff Carruesco,REHS,RDI <br /> �<•. p <br /> Website: www.sjgov.org/ehd Kasey Foley,REHSLindaTurkatte,REHS <br /> Phone: (209)468-3420 <br /> Fax: (209)464-0138 <br /> -May 25, 2011 <br /> Messrs. Kirk Larson, PG, and Robert Trommer, CHG <br /> State Water Resources Control Board <br /> Division of Financial Assistance <br /> 1001 1 Street <br /> Sacramento CA 95814 CUF Claim No. 15738 <br /> Subject: 3250 Hammer Way W, Stockton, CA, <br /> April 2011 Five-Year Review Letter Recommendations <br /> San Joaquin County Environmental 'Health Department (EHD) has received and reviewed the <br /> five-year review letter dated 18 April 2011 from Kirk Larson of the State Water Quality Control <br /> Board (SWQCB) Cleanup Fund (CUF) for above referenced site. The CUF recommended that <br /> the EHD consider the site for closure.. <br /> The CUF recommendations for 2008, 2009 and 2010 were for implementation of groundwater <br /> remediation, which the EHD had been directing. By letter dated 21 July 2010, the EHD <br /> approved a work plan for installation of four injection wells for a 90-day ozone injection pilot test. <br /> The wells were installed.in early March 2011, parts for the ozone injection system were ordered <br /> and installed in mid-May 2011, and initiation of the pilot test is scheduled for June 1, 2011. <br /> As so much effort has been expended to prepare for the 90-day pilot test, the EHD recommends <br /> that the CUF refrain from issuing the site closure recommendation to permit the pilot test to <br /> proceed. While contaminant concentrations have declined over the last ten years, there has <br /> been shifting of the plume from MW-3 to MW-2 in 2006 and 2007, and down-gradient MW-5 <br /> became impacted in late 2006. While the maximum benefit from the remediation system would <br /> have been achieved some years ago, since the system is now ready to go, the EHD believes <br /> some benefit can be obtained by at least conducting the pilot test and evaluating the results. <br /> Questions or comments should be directed to Vicki McCartney at (209) 468-9852 or to. Nuel <br /> Henderson at (209) 468-3436. . <br /> Sincerely, <br /> Victoria L. McCartney, REHS Nuel Henderson, PG <br /> Senior Registered Environmental Engineering Geologist <br /> Health Specialist <br /> Fourth 5-Year Review Letter Response 0511.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.