My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:21:36 AM
Creation date
1/31/2020 8:45:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i <br /> s <br /> Mr. Sam Savig Project 880-040.1A <br /> December 13, 2001 <br /> Page 5 <br /> include an evaluation of current site conditions, including an evaluation of the feasibility of <br /> implementing groundwater extraction, vapor extraction, or DPE.as a remedial solution. <br /> SCHEDULE <br /> IT is prepared to initiate the well/boring installations and the DPE testuponapproval from the <br /> SJCEHD. Once approval is granted,IT will submit a pre-approval to the Underground Storage <br /> Tank Fund, submit the well/boring permits to the SJCEHD, submit a letter of notification to the <br /> SJVUAPCD, and schedule the work with the subcontractors. IT anticipates this process will <br /> require approximately one month to complete. <br /> If you have any questions regarding this Workplan or require additional information please <br /> contact the undersigned at(916) 928-3300. <br /> Sincerely, <br /> IT Corporation <br /> Kathleen A. Waldo <br /> Staff Engineer Ep G <br /> MICHAEL <br /> SGOURAKIS <br /> Mike Sgourakis, RG N� No.7194 <br /> P ject Geologist <br /> SSS ✓ `369 OF CAL�FO <br /> Attachments: Figure 1 —Site Location Map <br /> Figure 2—TPH-g/Benzene/MtBE.Concentration Map, Fourth <br /> Quarter 2001 <br /> Figure 3 —Proposed Well/Boring Location Map <br /> Attachment A—San Joaquin County Letter <br /> Attachment B —Drilling and Sampling Procedures <br /> Attachment C—Draft Health And Safety Plan <br /> cc: Mr. Jim Parkinson, 3250 West Hammer Lane, Stockton, 'California <br /> N:\sacDP\2001\PRJ\PJ8\8800401 A.l ac.doc <br /> 12/13/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.