Laserfiche WebLink
i <br /> i <br /> s <br /> Mr. Sam Savig Project 880-040.1A <br /> December 13, 2001 <br /> Page 5 <br /> include an evaluation of current site conditions, including an evaluation of the feasibility of <br /> implementing groundwater extraction, vapor extraction, or DPE.as a remedial solution. <br /> SCHEDULE <br /> IT is prepared to initiate the well/boring installations and the DPE testuponapproval from the <br /> SJCEHD. Once approval is granted,IT will submit a pre-approval to the Underground Storage <br /> Tank Fund, submit the well/boring permits to the SJCEHD, submit a letter of notification to the <br /> SJVUAPCD, and schedule the work with the subcontractors. IT anticipates this process will <br /> require approximately one month to complete. <br /> If you have any questions regarding this Workplan or require additional information please <br /> contact the undersigned at(916) 928-3300. <br /> Sincerely, <br /> IT Corporation <br /> Kathleen A. Waldo <br /> Staff Engineer Ep G <br /> MICHAEL <br /> SGOURAKIS <br /> Mike Sgourakis, RG N� No.7194 <br /> P ject Geologist <br /> SSS ✓ `369 OF CAL�FO <br /> Attachments: Figure 1 —Site Location Map <br /> Figure 2—TPH-g/Benzene/MtBE.Concentration Map, Fourth <br /> Quarter 2001 <br /> Figure 3 —Proposed Well/Boring Location Map <br /> Attachment A—San Joaquin County Letter <br /> Attachment B —Drilling and Sampling Procedures <br /> Attachment C—Draft Health And Safety Plan <br /> cc: Mr. Jim Parkinson, 3250 West Hammer Lane, Stockton, 'California <br /> N:\sacDP\2001\PRJ\PJ8\8800401 A.l ac.doc <br /> 12/13/01 <br />