My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:21:36 AM
Creation date
1/31/2020 8:45:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I I <br /> x DRAFT <br /> SITE HEALTH AND SAFETY PLAN <br /> I. GENERAL SITE INFORMATION <br /> Site Name: Parkinson's Hammer I5 Arco <br /> Site Address: 3250 West Hammer Lane, Stockton <br /> Contact Person: Kathleen Waldo Phone: (916) 928-3300 <br /> Site I.D. Number: 880-040.1A Proposed Date(s) of Site Work: <br /> II. DESCRIPTION OF INSPECTION ACTIVITY <br /> Purpose of Activity: Type of Site: <br /> ® Monitoring/extraction well installation ® Retail gas station/former gas station <br /> ❑ Vapor extraction well installation ❑ Petroleum Plant <br /> ❑ Well abandonment ❑ Industrial <br /> ® Soil boring/geoprobe/hydropunch ❑ Landfill <br /> ❑ Other: (specify) Shallow Excavation ❑ Other(specify): <br /> Provide a brief description of the proposed activities: <br /> Completion of cone penetrometry test borings and installation of groundwater monitoring wells. <br /> Investigation-derived material disposal: <br /> Soil: stockpiled <br /> Water: drums <br /> Other: <br /> a <br /> III. POTENTIAL HEALTH AND SAFETY HAZARDS <br /> Anticipated physical hazards. Check all that ably. <br /> ❑ Heat (high ambient temperature) ® Heavy equipment <br /> ❑ Cold ® Physical.injury/trauma resulting from <br /> ® Noise moving machinery <br /> ❑ Oxygen depletion/asphykiation <br /> ❑ Excavation cave-ins ® General construction physical injury/trauma <br /> ® Falls, trips, slipping ❑ Electrical hazards <br /> ® Traffic control <br /> ® Overhead hazards ❑ Other: (specify) <br /> i <br /> i <br /> \\SACRFP 1\COMMON\rancfp l\Proj ects\Proj ects\880\040\l a\0102\SSP.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.