My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:21:36 AM
Creation date
1/31/2020 8:45:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� u <br /> Field Practices and Procedures <br /> Page 2 <br /> samplers will be steam cleaned between each boring to reduce the possibility of cross <br /> contamination. Steam cleaning effluent will be contained in 55-gallon drums and <br /> temporarily stored on site. The disposal of the.effluent will be the responsibility of the <br /> client. <br /> Drill cuttings generated during the drilling procedure will be stockpiled on site. <br /> Stockpiled drill cuttings will be placed on and covered with plastic sheeting. The <br /> stockpiled soil is typically characterized by,collecting and analyzing composite samples <br /> from the stockpile. Stratus Environmental will recommend an appropriate method for <br /> disposition of the cuttings based on the analytical.results. The client will be responsible <br /> for disposal of the drill cuttings. <br /> Soil Sample Collection <br /> During drilling, soil samples will be collected in cleaned brass, two by six inch tubes. <br /> The tubes will be set in an 18-inch-long split-barrel sampler. The sampler will be <br /> conveyed to bottom of the boreholeattached to a wire-line hammer device on the drill <br /> rig. When possible, the split-barrel sampler will ;be driven its entire length, either <br /> hydraulically or by repeated pounding a 140-pound:hammer using a 30-inch drop. The <br /> number of drops (blows) used to drive the sampler will be recorded on the boring log. <br /> The sampler will be extracted from the borehole, and the tubes containing the soil <br /> samples will be removed. Upon removal,-the ends of the lowermost tube will be sealed <br /> with Teflon sheets and plastic caps. Soil.samples for chemical analysis will be labeled, <br /> placed on ice, and delivered to a state-certified analytical laboratory, along with the <br /> appropriate chain-of-custody documentation. <br /> Soil Classification <br /> As the samples are obtained in the field, .they will be classified by the field geologist in <br /> accordance with the Unified Soil Classification System. Representative portions of the <br /> samples will be retained for further examination and for verification of the field <br /> classification. Logs of the borings indicating the depth.and identification of the various <br /> strata and pertinent information regarding the method of maintaining and advancing the <br /> borehole will be prepared. <br /> Soil Sample Screening <br /> Soil samples selected for chemical analysis will be determined from a head-space <br /> analysis using a PID or an FID. The soil ,will be placed in a Ziploc® bag, sealed, and <br /> allowed to reach ambient temperature, at which time the PID probe will be inserted into <br /> the Ziploc' bag. The total volatile hydrocarbons present are detected by the PID and <br /> reported in parts per million by volume (ppmv). The PID will be calibrated to an <br /> isobutylene standard. <br /> MAField Practices\Field Practices and Procedures-revised 07-2004.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.