My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:21:36 AM
Creation date
1/31/2020 8:45:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Field Practices and Procedures <br /> Page 4 <br /> 2-inch-diameter flush-threaded casing is generally used for wells dedicated for <br /> groundwater monitoring purposes. <br /> A monitoring well is typically cased with threaded, factory-perforated and blank <br /> Schedule 40 PVC. The perforated interval consists of slotted casing, generally with 0.01 <br /> or 0.02 inch-wide by 1.5-inch-long slots,with 42 slots per foot. The screened sections of <br /> casing are factory machine slotted and will be installed approximately 5 feet above and <br /> 10 feet below first-encountered water level. The screened interval will allow for seasonal <br /> fluctuation in water level and for monitoring floating product. A threaded or slip PVC <br /> cap is secured to the bottom of the casing. The slip cap can be secured.with stainless <br /> steel screws or friction; no solvents or cements are used. Centering devices may be <br /> fastened to the casing to ensure even distribution of filter material and grout within the <br /> borehole annulus. The well casing is thoroughly washed and/or steam cleaned, or may be <br /> purchased as pre-cleaned,prior to completion. <br /> A filter pack of graded sand will be placed in the annular space between the PVC casing <br /> and the borehole wall. Sand will be added to the borehole through the hollow stem of the <br /> augers to provide a uniform filter pack around the casing and to stabilize the borehole. <br /> The sand pack will be placed to a maximum of 2 feet above the screens, followed by a <br /> minimum 1-foot seal consisting of bentonite pellets. <br /> Cement grout containing 5 percent bentonite or concrete will be placed above the <br /> bentonite seal to the ground surface. A concrete traffic-rated vault box will be installed <br /> over the monitoring well(s). A watertight locking cap will be installed over the top of the <br /> well casing. Reference elevations for each monitoring well will be surveyed when more <br /> than two wells will be located on site. Monitoring well elevations will be surveyed by a <br /> California licensed surveyor to the nearest 0.01-foot relative to mean sea level (MSL). <br /> Horizontal coordinates of the wells will be measured at the same time. <br /> Exploratory boring logs and well construction details will be prepared for the final <br /> written report. <br /> M:\Field PracticesTield Practices and Procedures-revised 07-2004.doc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.