Laserfiche WebLink
CALIFORNIA LABORATORY SERVICES <br /> 1 <br /> 08/23/04 13 01 <br /> SHAW,E&I Inc (Sacramento) Project Parkinson's Arco,Stockton CLS Work Order# CNH0415 <br /> 1326 North Market Blvd Project Number [none] <br /> Sacramento CA,95834 Project Manager David Herzog COC# None <br />' Notes and Definitions <br /> QM-02 The RPD and/or percent recovery for this QC spike sample cannot be accurately calculated due to the high concentration of <br /> analyte inherent in the sample <br /> GAS-1 Although sample contains compounds in the retention time range associated with gasoline,the chromatogram was not consistent <br /> with the expected chromatographic pattern or"fingerprint" However,the reported concentration is based on gasoline <br /> DET Analyte DETECTED <br /> ND Analyte NOT DETECTED at or above the reporting hnut <br /> NR Not Reported <br /> dry Sample results reported on a dry weight basis <br /> RPD Relative Percent Difference <br />