My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002915
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
ARCHIVED REPORTS_XR0002915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:49:43 AM
Creation date
1/31/2020 9:21:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002915
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Ms Margaret Lagorio Project No 880-040 1 <br /> V November 8, 2002 <br /> ' Page 10 <br /> provide downgradient control for the Parkinson's Arco site, so additional downgradient <br /> assessment for the subject site is not warranted at this time <br /> During the 5-day DPE test, approximately 23 pounds (3 7 gallons) of hydrocarbons were <br /> removed from well MW-1 by vapor extraction Approximately 19,700 gallons of <br /> groundwater was extracted from well MW-1 during the test Based on the average <br />' concentrations of dissolved TPHg, benzene, and MtBE reported in the groundwater <br /> effluent pumped from the well, approximately 7 0 x 10'5 pounds of TPHg, 4 4 x 10-6 <br /> pounds of benzene, and 4 4 x 104 pounds of MtBE were removed <br /> Based on the results of the DPE test, DPE appears to be an effective remedial alternative <br />' to remove MtBE and other oxygenates from soil and groundwater, and control off-site <br /> migration Shaw E & I recommends that a Corrective Action Plan be prepared for this <br /> site per UST Cleanup Fund guidelines <br /> If you have any questions regarding this work or require additional information, please <br />' contact David W Herzog at(916) 565-4377 <br /> Sincerely, <br />' Shaw Environmental & Infrastruct <br /> ar pR' 0 <br /> 1 David W Herzog, G No.7219 Ed K Simonis, RG <br /> Project Geologist Senior Geologist <br />' Attachments Figure 1 — Site L <br /> Figure 2 — Site Map <br /> Figure 3 — Groundwater Elevation Contour Map, Third Quarter 2002 <br /> Figure 4—TPHg/Benzene/MtBE Concentration Map, Third Quarter 2002 <br /> rTable 1 — Soil Analytical Data <br /> r <br /> rN lrancfpllProlectsTrolects1880104011 a101101Assessment and Interim Remedial Report doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.