Laserfiche WebLink
Q WEST HAMMER LANE <br /> • DRIVEWAY <br /> 00 N <br /> 0000 PLANTER <br /> La I CANOPY <br /> Z <br /> MW-4 <br /> (<50/1 1/14,000) <br /> n I MW-3Z `. <br /> 0 (170/0 39/300) <br /> a- <br /> I (� oMW-1 <br /> p ,' (10,060/850/7,400) <br /> MW-5 <br /> (<50/<0 3/18,000) <br /> x ` 0 <br /> PRODUCT Q <br /> _ • f PIPING O <br /> I F- <br /> Z <br /> o W <br /> n � <br /> (DW <br /> N E N E Nc: <br /> V <br /> 00 W <br /> I <br /> U <br /> STATION Q <br /> 1 I BUILDING <br /> 1 � <br /> MW-2 <br />' (<50/<O 3/4,000) <br /> I AIR & <br /> WATER <br /> LEGEND <br /> MW-1 GROUNDWATER MONITORING WELL <br /> Z ® PARKINSON'S HAMMER <br /> LOCATIONS AND DESIGNATIONS <br /> 15 ARCO STATION <br /> (10,000/850/7,400) TPH—g/BENZENE MTBE CONCENTRATIONS SFOW- 3250 WEST HAMMER LANE <br /> IN ug/L, 7/292 Shaw E 81,Inc. STTOCKTON, CALIFORNIA <br /> i <br /> FIGURE 2 <br /> S C A L E TPM-G/BENZENE/MTBE CONCENTRATION MAP <br /> 0 20 40 FEETI THIRD QUARTER 2002 <br /> / N\rancfp 1\Projects\Projects\880\040\1 a\0107\2002\TPH83Q02 dwg <br />