To KATHLEEN WALDO IT CORPORFrom MIKE FARLEY 209-474-8746FARLEYS SURVEYING INC 100 11 30 36 Page 2 of 3 I❑ 1156
<br /> ARCO STATION
<br /> HAMMER LN @ I-5
<br /> IT CORP
<br /> 11/9/00
<br /> PT # NORTH EAST ELEVATION DESCRIPTION
<br /> 2, 6327.4369400, 4997 8312000, 2 08,BM
<br /> C3-
<br /> 4990,4294500, 4947 1005100, 4.30,MW1
<br /> A,w 5014 5061000, 4869 1694600, 4 74,MW2
<br /> 5048.6194300, 4962 1754100, 3 76,MW3
<br /> 6, 5031.0258000, 4852 1789600, 7 92,BC
<br /> 4995 1219800, 4950 2650300, 4 68,PC
<br /> 8, 5022 2525000, 4976 6457200, 4 22,PC
<br /> 5054 2652900, 4943 7215300, 4 24,PC
<br /> �I0.,.-- 5056.3239100, 4904 1675600, 7 92,BC
<br /> ii'�"N 5084.1680400, 4903 7982400, 7 91,BC
<br /> - , 5020 2732700, 4915.4003800, 4 83,CC
<br /> 09;' 4986 1544200, 4916 2825100, 4 83,CC
<br /> 4985 6228200, 4876 7621800, 5.15,CC
<br /> r 4988.0893400, 4847 4981000, 5 93,BM
<br /> NOTE, ELEVATIONS FOR MONITORING WELLS ARE GIVEN TO TOP OF PVC PIPE
<br />
|