Laserfiche WebLink
S <br /> Sequoia 819 Striker Avenue Sufte <br /> Sacramento, CA 958 <br /> Analytical (916'921-96( <br /> FAX(916)921-01( <br /> IT Corporation-Sacramento Project Parkinson ARCO Sampled 1/26/00 <br /> 1433 N Market Blvd,Ste 1 Project Number 880-040 1A Received 1/27/00 <br /> Sacramento,CA 95834 Project Manager Kathleen Waldo Reported 2/9/00 <br /> ANALYTICAL REPORT FOR S001351 <br /> Sample Description Laboratory Sam le Number Sample Matrix Date Sam led <br /> D-1@9' S001351-01 Soil I/26/00 <br /> D-1 @ 10'C S001351-02 Soil 1/26/00 <br /> D-1 @ 10'W S001351-03 Soil 1/26/00 <br /> D-1 @9'N S001351-04 Soil 1/26/00 <br /> D-1 @10'E l0'E 5001351-05 Soil <br /> 1126100 <br /> D-3@4 5'C S001351-06 Soil <br /> 1/26/00 <br /> D-5@5'C S001351-07 SOL] 1126/00 <br /> D-8@8'C S001351-08 Soil 1126/00 <br /> W&SW S001351-09 Soil 1/26/00 <br /> D-8@8'SE S001351-10 Soil <br /> 1/26100 <br /> D-8@8'NE 5001351-11 Soil 1/26/00 <br /> SPO-(1-4)Composite S001351-12 Soil 1/26/00 <br /> Sequoia Analytical- Sacramento The results in this report apply to the samples analyzedin accordance with the chain of custody document <br /> This analytical report must be reproduced in its entirety <br /> Page 1 of 16 <br />