Laserfiche WebLink
CALIFORNIA LABORATORY SERVICES <br /> 04/27/05 1158 <br /> SHAW,E&I Inc (Sacramento) Project Parkinson's Arco,Stockton <br /> CLS Work Order# COD06S7 <br /> 1326 North Market Blvd Project Number 8800401A <br /> Sacramento,CA 95834 Project Manager Dan Wynne <br /> Notes and Definitions <br /> R-06 Sample had to be diluted due to high levels of a target analyte,which resulted in elevated reporting limits for all analytes in the <br /> Sample <br /> e GAS-] Although sample contains compounds in the retention time range associated with gasoline,the chromatogram was not consistent <br /> with the expected chromatographic pattern or"fingerprint" However,the reported concentration is based on gasoline <br /> DEI' Analyte DETECTED <br /> ND Analyte NOT DETECTED at or above the reporting Limit <br /> NR Not Reported <br /> dry Sample results reported on a dry weight basis <br /> RPD Relative Percent Difference <br /> 1 <br />