Laserfiche WebLink
soil/land surface, and/or transpiration by plants. However, in this particular case it is a suitable <br /> approximation because of the size of the property in relation to the small wastewater volumes <br /> that will be generated. An additional consideration is the site development plan that provides for <br /> collection of runoff in three onsite retention basins;this will aid in achieving rainfall-recharge <br /> volumes close to the average rainfall amount. No further analysis or response is required. I <br /> recommend acceptance of the Nitrate Loading Study as submitted. <br /> 2 <br />