Laserfiche WebLink
s1� 1 <br /> r �t Quik Stop Markets <br /> I Project No.62503.0003 t"j February 1999 <br /> i Page 4 <br /> t � 5 <br /> i6. -SPECIFIC SAFETY REQUIREMENTS <br /> I t ' <br /> Safety requirements specific to the 3555 W. Hammer Lane site include the fo111I wing: <br /> e <br /> Pote'n' tial Hazard Protective Measure <br /> Residual gasoline fuel and vapors Level D protective clothing will be worn. <br /> from r'e'moved tanks Respiratory protective devices will organic <br /> ¢ vapor cartridges will lie kept readily <br /> available. f <br /> Flammability of vapors All pumps, hoses, nozzles, couplings, etc. <br /> will be made of nonsparking materials. An <br /> organic vapor/explosive meter will be used to <br /> continuously monitor the immediate work are <br /> for the level of organic vapors present <br /> Loud equipment noises Proper hearing protection isl+Lquired <br /> Wet and slippery surfaces No-slip soled boots for fl and grease are 1 <br /> required. <br /> Heavy equipment operations All personnel will wear hard hatsand stay <br /> clear of movable equipment jparts. <br /> Open excavations and cave-ins Personnel will be required to stay at least 2 <br /> feet from edges of open excavations. Under <br /> no circumstances shall a �person 'enter an <br /> excavation over 4 feet deep;, ithout following <br /> proper Occupational Safety and Health <br /> Administration (OSHA) requirements. <br /> S; C <br /> Working with basic construction tools Common sense will be practiced. Special <br /> clothing required during operation of specific <br /> equipment will be worn. �{ <br /> 7i f <br /> a <br /> L( 3 <br /> \\PLEASAMONWO�EFIRMAMQUIKSTOMI33\Projttt Saftty Plan doc j <br />