Laserfiche WebLink
U <br /> t� <br /> (i.e., the north end of the pump island). ATCff�oses to advance two (2)soil borings (designated SB-4 <br /> and SB-5) to an approximate depth of ap,foximately 15 feet bgs. One soil sample will be collected from <br /> each of the two proposed borings at th .capillary fringe, and one groundwater sample will be collected <br /> from each boring at approximately 15 eet bgs. Borings SB-4 and SB=5 will then be advanced to 40 feet-.Sam <br /> bgs, and groundwater samples will be collected from the bottoms of those borings using Hydropunch bvvv�tn/� <br /> techniques. One(1)additional boring(SB-6)will be continuously cored to a depth of approximately 40 feet <br /> bgs; a soil sample will be collected at the capillary fringe from this boring. Depth discrete groundwater <br /> samples will also be collected from the shallow zone(from approximately 15 feet bgs)and the deep zone <br /> (from approximately 40 feet bgs) at boring SB-6. <br /> The anticipated scope of work is as follows. <br /> SCOPE OF WORK <br /> Task 1 Pre-field Activities/HASP <br /> i <br /> This task includes all the activities related to pre-mobilization, permits, site clearance and site specific E <br /> Health and Safety Plan (HASP) preparation. The drilling permit will be obtained from SJCEHD. A work <br /> plan is also required for submittal with the drilling permit application. The borehole locations will be <br /> marked with white paint and ,Underground Service Alert (USA) will be notified at least 48 hours prior to <br /> initiating drilling activities to allow time for utility.companies to identify underground lines, pipes, or cables <br /> that may be affected by the drilling activities. A.private utility locator will also be retained to ensure that the i <br /> proposed locations do not conflict with underground utility locations. A HASP will be prepared for the I <br /> subject site investigation based on requirements of Title 29 of the Code of Federal Regulations (CFR) <br /> Section 1920.1200), the California General Industry Safety Order(GISO) and Title 8, California Code of <br /> Regulations (CCR) Section 5192: A copy of the HASP will be on-site during the course of the field <br /> activities. <br /> Task 2 Drilling/Soil and Groundwater Sampling/Sample Analysis <br /> ATC will utilize hand-auger techniques to clear the proposed boring locations to approximately 5 feet bgs. <br /> All drilling and sampling activities will be performed consistent with ATC's standard operating procedures <br /> (Attachment if )` o+' <br /> The locations of the proposed borings are illustrated on Figure 1,Proposed Boring Location Map.The soil i <br /> borings will be drilled using a track-mounted, direct push (Geoproobbe)drilling rig. Drilling will be conducted <br /> by a California C57-licensed drilling company. :An ATC field scientist, under the responsible charge of a <br /> California registered professional engineer or geologist,will log the borings and collect soil samples. ATC <br /> proposes to advance three soil borings (S!34,'S!3-5 and SB-6) at the locations presented in Figure 1. <br /> During drilling of borings B-4 and B-5, an approximately 1.5-inch diameter borehole will be advanced and <br /> logger ed to an approximate.,depth of 15 feet bgs (approximately 2�to 3_feet below first encountered <br /> groundwater). Soil samples will be collected just above the water table(i.e., at approximately 10 feet bgs) <br /> or where elevated PID readings indicate the presence of impact. A shallow zone groundwater sample will <br /> V � Additional Investigation Workplan <br /> Quik Stop No.132,Stockton,CA <br /> May 18,2009 <br /> t <br /> 3 <br />