My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012711
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
3500 - Local Oversight Program
>
PR0545252
>
ARCHIVED REPORTS_XR0012711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 12:21:26 PM
Creation date
1/31/2020 11:25:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012711
RECORD_ID
PR0545252
PE
3528
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
02
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MiY.. _ .. -�_ _ .. _ _ _ <br /> 1 <br /> AUG 22 '90 15:11 EXCELTECH/SF P.4 <br /> Quik Stop Markets August 14, 1990 <br /> Project No. 349132-41 Page 1 <br /> PROJECT <br /> i <br /> r FOR <br /> QUID STOP MARKETS #132 <br /> 3555 W HAMMER LANE <br /> STOCKTON, CALIFORNIA <br /> 1. IN'T'RODUCTION <br /> This revised Project Safety Plan delineates the basic safety requirements for the <br /> emergency response, soil excavation,and geological investigation for the facility located <br /> at 3555 W Hammer Lane,Stock.on, County of San Joaquin, California. <br /> The site is a service station and convience store facility. The underground storage tanks <br /> an the premises contained , gasoline.Exceltech Inc.'s work,,vill include excavation of <br /> contaminated soil, possible remediation of the soil, backfilling the excavation., and <br /> geological investigation. <br /> To provide for site security, the site will be blocked off for the duration of the project <br /> This will be accomplished through the use of a Moot high baracde (on the.Hammer and <br /> Mariners Street sides). Signs which read "Construction Zane--Authorized Personnel <br /> Only" will be attached to the baracades. In addition, barricades with reflective tape and <br /> battery-operated flashers will be used around the inside. <br /> The provisions set forth in this plan will apply to the employees of Exceltech, Inc, and <br /> its subcontractors working on the project. The subcontractors may elect to modify <br /> these provisions, but only to upgrade or increase the safety requirements, and only with <br /> the concurrence of Exceltech,Incas designated and accepted in writing. i <br /> This Project Safety Playa addresses the expected potential hazards that may be i <br /> encountered during this project. Field.activities will begin on July 31, 1990 and are <br /> expected to continue for approximately 3 weeks from the start date. If changes in site <br /> or working conditions occur as the activities progress, amendments to this plan will be <br /> provided by Exceltech,Inc. <br /> 3 <br /> 2. PROJECT SAFETYAUTHORITY - - - - - <br /> Personnel responsible for the project safety are; Eric Kieselbach, Corporate Safety <br /> Officer; Jim Jordan, Fremont Office Safc't Coordinator; <br /> Y Randy Scone, Project <br /> Manager; Tom Hicks, Project Supervisor; Torn Hicks, project Foreman; and John <br /> Monroe, Project Geologist. <br />
The URL can be used to link to this page
Your browser does not support the video tag.