My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012711
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
3500 - Local Oversight Program
>
PR0545252
>
ARCHIVED REPORTS_XR0012711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 12:21:26 PM
Creation date
1/31/2020 11:25:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012711
RECORD_ID
PR0545252
PE
3528
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
02
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 ' <br /> SOIL SAMPLING PROTOCOL <br /> I. SOIL SAMPLING BY DRILLING RIG <br /> 1) Review site proposal for boring Iocations and special instructions. Confirn <br /> boring locations in field with client. Have Underground Service Alert(USA) <br /> mark utilities in area prior to drilling. <br /> 2) Prior to initiating an exploratory boring, all equipment to be used during <br /> drilling and sampling operation is steam cleaned. Such equipment includes, <br /> but is not limited to, augers, bits, drilling rod, samplers, and brass sampler <br /> liner,. Additionally, between sampling intervals, the sampler is thoroughly <br /> cleaned with a dilute trisodium phosphate solution and rinsed with clean tap <br /> water or distilled water. <br /> 3) Each exploratory boring is drilled with a truck-mounted drilling rig using <br /> either solid flight or hollow stem augers. The boring is advanced to the <br /> desired sampling depth and the sampler is lowered to the bottom of the hole. <br /> The sampler is driven a maximum of 18 inches into the undisturbed soils <br /> ahead of the auger.by a 140-pound, rig-operated hammer falling 30 inches. <br /> The number of blows required to drive the sampler the final 12 inches is <br /> recorded on the boring log. When necessary, the sampler may be pushed by <br /> the drill rig hydraulics. In this case, the pressure exerted (in pounds per <br /> square inch) is recorded. After the sampler has penetrated the full depth, it is <br /> retrieved to the surface, <br /> ` t 4) The samplers commonly used are either a California modified sampler (3 <br /> inch or 2.5 inch O.D.) or a standard penetrometer (2 inch O:D.). The <br /> ' standard <br /> penetrometer does not contain sample liners and is used to determine <br /> soil strength characteristics and visually characterize the subsurface materials. <br /> If samples are collected for laboratory analysis the California modified <br /> sampler, equipped with brass liners, is used except when the analysis will <br /> include coppar or zinc. In this instance, <br /> the sample should be taken-with the_._ - �. <br /> standard penetrometer and placed in a labeled plastic bag. <br /> r Upon retrieval, the sampler is disassembled into.its component parts. One or <br /> more of the liners is selected for chemical analysis. The ends of the selected <br /> EXCELTECH, INC. <br /> Soil Sampling Protocol <br /> Latest Revision. March 28, 1990 <br /> z .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.