Laserfiche WebLink
-- „' .rY ''.a. ' TW "x,S'4 - ',.. `- '"z�'�-..,. � "'a� ' � n �. - ' <br /> 'N-.m — <br /> o -ap-0 �. � - <br /> ?. syr-• _ _J <br /> rs <br /> 2 Quik Stop Market No. 132 October 30, 1990 <br /> .� <br /> ,lob No. 349132-32 Mage 5 <br /> REPORT <br /> Exceltech will prepare a site investigation report presenting the findings of the <br /> investigation. The final report will include: <br /> 3 <br /> f The signature and seal of a state of California Certified Engineering <br /> —" Geolgoist. <br /> • Field procedures for exploratory borings. <br /> -! Results of analytical testing. <br /> A site map showing features relevant to the investigation. <br /> Boring logs for each exploratory boring drilled by Exceltech. <br /> • Construction details of the groundwater monitoring well. <br /> Groundwater elevation contour map, if applicable. <br /> • Interpretation of data. <br /> • Recommendations. <br /> I SCHEDULE <br /> i <br /> Exceltechis prepared to perform the proposed scope of work once approval is received <br /> from the San Joaquin County Health District. The drilling is expected to:take two days <br /> and well.development one day. The sampling of the wells will take place at least 3 days <br /> following development. Laboratory results will be available approximately 2 weeks <br /> following submittal. A final written report will bereared.when the results.of <br /> P P all <br /> phases are completed:Lj <br /> ri <br /> Ai <br /> r <br /> 1 ' <br /> , . <br /> 18f ¢®p� �i aisw® <br />